What does a full kitchen remodel cost in the Park Cities, and who does quality work?

No honest price exists before drawings, but the shape of the budget does: where the money goes, what makes a 1910s–1930s Park Cities kitchen cost more, the levers that keep it down, and how to compare two estimates.

Remodeling · 14 min read · Written & reviewed by Jan Revels, ASID Allied, American Society of Interior Designers · designing in Dallas since 1997
Published

Short answer

There’s no honest single price for a full kitchen remodel in the Park Cities before drawings. The budget depends on whether walls and plumbing move and what a house from the 1910s through the 1930s may hide. Get a real number from a scaled plan and an itemized estimate, and look for a contractor who can show kitchens they built. At Chateau Concepts, Jan Revels, ASID Allied, designs and builds Park Cities kitchens and prices construction from drawings.

Key takeaways

Who should you trust to design and build your kitchen?

Ask to see a kitchen the firm built and the kind of drawings its trades work from. Then ask who visits the site, who checks that the work matches the drawings, and who makes the design call if a pipe or beam gets in the way. Those responsibilities matter when, for example, moving a duct could change the height of the cabinets and the alignment of the trim.

At Chateau Concepts, Jan draws the plan and elevations to scale, makes selections with you, and runs the build herself as general contractor. She schedules trades, orders and tracks materials, pulls permits, walks the site, and checks the work against the approved drawings. If something unexpected turns up behind a wall, the person deciding how to handle it is the person who designed the room. You get a weekly update during the build.

Jan Revels, ASID Allied, has practiced interior design in Dallas since 1997 and founded Chateau Concepts, LLC in 2001. She holds a BFA in Interior Design from the University of North Texas. Chateau Concepts is registered with the City of Dallas as a general contractor and carries general liability insurance. Certificates are available on request.

Look at built work for details that matter to your kitchen. In Cedarbrush Kitchen, the dark wood island includes a beverage refrigerator. Look at how the appliance, doors, and finished panels fit together. In Blue Sky Kitchen, the sink run opens to the family room, so you can see how a working part of the kitchen looks from an adjoining room. Our portfolio is on this site and on Houzz, and our testimonials are signed by name. Chateau Concepts has a 4.9-star rating from 19 Google reviews. See how to vet a contractor in Dallas.

Kitchen with white raised-panel cabinets, granite counters, a dark wood island with a beverage refrigerator, a glass mosaic backsplash and red glass pendants
Cedarbrush Kitchen, a Chateau Concepts project. Look at where the money sits: cabinetry and its installation (the raised-panel runs and the island with its built-in beverage refrigerator), then the stone, the tile and the lighting, the lines people tend to underestimate.

Where does the money go in a full kitchen remodel?

A cabinet estimate can cover boxes and doors while leaving the finished ends, fillers, trim, and installation to other lines. Stone has a similar split. The slab is the material, while fabrication covers the work of turning it into counters that fit your room, sink, and cooktop. Ask what each line buys through installation. See what interior design costs in Dallas.

Where the money goes in a kitchen remodel

Budget lineShareWhat to settle early
Cabinetry and installationLargestCabinet tier, door style, drawers and inserts, finished panels and trim, and who installs and fits the cabinets
Labor and tradesSecondDemolition, framing, plumbing, electrical, wall repair, tile, painting, and which surfaces need patching
AppliancesOften underestimatedExact models, required openings and clearances, connections, and who sets and connects each appliance
LightingOften underestimatedFixture locations, undercabinet lighting, wiring, switches, and dimmers
Stone fabricationOften underestimatedSlab choice, template, edge, seams, sink and cooktop cutouts, and installation

What this means for you: A kitchen with straightforward finishes can still take considerable labor. Ask the estimator to show where preparation and installation are carried, especially when a product appears on one line and the work needed to fit it appears elsewhere.

Screenshot of the Chateau Concepts table of where the money goes by project type, with the kitchen remodel row outlined in orange
From our guide What interior design costs in Dallas. Look at the outlined kitchen row: cabinetry and installation take the largest share, labor and trades the second, and appliances, lighting and stone fabrication are the lines most often underestimated. Screenshot: chateauconcepts.com, November 2026.

Follow the work beyond the cabinets. Taking out a backsplash can pull away the surface behind it. Taking down a wall can leave a strip of unfinished floor and a ceiling seam that needs repair. Removing an old cabinet run can expose a wall that needs preparation before the new cabinets sit flat. These jobs are easy to miss because you spend the design meetings looking at what will go into the room.

We work through the layout, cabinetry, appliances and plumbing, counters, backsplash, lighting, and hardware in that order. The cabinet design tells us which appliance openings we need, and we specify the exact appliances before ordering cabinets. We choose counters against the actual slab in daylight, then stand beside it to choose the backsplash. For lighting, we plan separately switched, dimmable task, ambient, and accent layers, so the electrician can price the controls and wiring as well as the fixtures.

Why can a Park Cities kitchen cost more than one in a newer Dallas house?

Highland Park was developed largely from the 1910s through the 1930s, and University Park from the 1920s onward. The original kitchen was often a small service room at the back, with a pantry, a breakfast room next door, small windows, and a service entrance. There was no island. If you want a kitchen where you can cook while talking to people at the breakfast table, the wall between the rooms is often the first thing to investigate.

Most houses here have already been altered. Part of the job may be taking out an earlier remodel and finding out how that work ties into the original house. North Texas clay adds another variable. When a floor has moved, the cabinet installer has to establish a level line, and the tile installer has to account for the change in height where the kitchen meets the next room. See the Park Cities home renovation guide.

What raises the cost in a Park Cities kitchen, and how to keep it down

Cost driverWhy it happens hereThe lever
Breakfast-room wallThe original rooms were separate, and the dividing wall often carries a loadVerify the load before drawing the opening. Compare keeping the wall with opening the rooms
Previous renovationsNew finishes can cover older work and make existing conditions hard to readIdentify what can be inspected before pricing and spell out which repairs the estimate assumes
Out-of-level floorsOlder houses on North Texas clay have movedCheck floor levels before finalizing cabinet heights, tile preparation, and room transitions
Plaster and trimNew work may meet real plaster and existing millworkLimit the area disturbed. Where a match is needed, take a trim section to a millwork shop and include specialist plaster repair
Plumbing on a slabMoving a sink or adding one to an island can mean cutting concreteKeep the sink on the existing run. If a move is essential, establish what kind of slab you have before pricing the route
Town permitsHighland Park and University Park issue their own permits separately from DallasConfirm the scope with the town that issues your permit and include that process in the schedule

What this means for you: A simple-looking opening can involve framing, electrical work, and repairs to the floor, ceiling, and trim. Decide what you need the opening to accomplish, then ask for an estimate that follows the work into both rooms.

On a post-tension slab, the tensioning cables need particular care if plumbing work requires cutting concrete. In a house built before 1980, we expect concealed conditions to affect at least some of the work. Rot, corroded supply lines, an undersized electrical panel, or a wall that turns out to be structural can change the scope once we can see inside.

University Park has required a permit application completeness meeting since January 1, 2025. For a Highland Park address, confirm the scope with Highland Park. Ask your contractor which town is reviewing the work, who is responsible for the application, and when permit review fits into the build schedule. See kitchen remodeling in Highland Park and University Park.

Should you refresh the kitchen, reconfigure it, or open it to the breakfast room?

Start with what bothers you when you use the kitchen. If you like where you prep, cook, and clean up, a refresh can give you better drawer storage, better light on the counters, and new surfaces while keeping the room’s working layout. If an open dishwasher blocks the path to the table or guests have to cross the cooking area to reach the refrigerator, draw those routes and see what a layout change would fix.

Refresh, reconfigure or open to the breakfast room

ScopeWhat changesPermitsRelative cost
RefreshCabinetry, counters, tile, and lighting within the existing layoutConfirm requirements with the town for the work included, especially wiring or connectionsLower
ReconfigureCabinet and appliance locations, potentially with moved plumbing, gas, or electricalConfirm permit requirements for the affected trades with the townMiddle
Open to the breakfast roomA wall opening plus work where the floors, ceilings, and trim of both rooms meetConfirm structural and trade permit requirements with the townHigher

What this means for you: These are relative comparisons for deciding what to draw and price. A refresh can include new cabinetry throughout. If a wider opening is what makes the kitchen work for your household, price the opening and the work it triggers before committing to finishes.

Keeping the sink, range, and refrigerator in place helps preserve the existing utility layout. Keeping plumbing and walls where they are is the largest cost lever. Before we draw a layout, we establish whether a wall proposed for removal is load-bearing and where the plumbing stack and gas line run. If you need more prep space, a dry island can provide it while the sink stays on its existing run. See kitchen and breakfast room remodel.

Cabinet tier is another lever. Stock cabinets make sense where available sizes fit the runs and give you the storage you need. Semi-custom can help where a particular width or depth matters. Fully custom can earn its place when the room calls for an unusual fit, a built-in look, or storage a standard box can’t provide. Ask where the added cost buys better use of the room and where a standard cabinet would serve the same purpose. See kitchen cabinet styles and doors.

Kitchen before and after: dated tile counters replaced with granite, glass mosaic backsplash and new appliances
A Chateau Concepts kitchen, before and after: tile counters replaced with granite, a glass mosaic backsplash and new appliances, with the layout kept. Leaving plumbing and walls where they are is the largest single lever on a kitchen budget.

How much should you set aside for surprises, and how do allowances work?

We recommend a contingency of 10 to 15 percent for a kitchen and a higher reserve in a home built before 1980. Our broader guidance for projects involving construction is 10 to 20 percent. Where you land depends on what we can verify before demolition and what stays concealed. If the floor is out of level and we can measure it, include the known preparation in the estimate. A corroded line discovered after demolition is the kind of condition the reserve is there to cover.

An allowance is a placeholder in the estimate for something you haven’t selected. Ask what product or work it covers, how the amount was set, and whether the installation is included. A stone allowance can look adequate until you learn that it covers the slab and leaves fabrication to another line. Whenever possible, choose the actual item before signing, or check the allowance against a specific product you’d be comfortable installing.

Budget drift comes from late decisions, low allowances, and concealed conditions. Finishing selections before demolition is the biggest preventable step. Changing a sink after the cabinet is ordered can affect the cabinet, the counter cutout, and the plumbing. That choice can also hold up the trades that follow.

Approve changes in writing before the changed work starts. The change order should describe the work, split labor and materials, state the schedule impact in days, and show the new contract total. Get it signed before giving the go-ahead. Five changes at two percent each add up to ten percent, so review the new running total each time. See change orders and budget control.

How do you compare two kitchen remodel estimates?

Give both contractors the same scaled plan, elevations, and selection list. Ask each to identify the drawing version used and mark anything left out or carried as an allowance. Then read down the estimates by scope. If one includes repairing the breakfast-room floor and the other ends at the kitchen opening, have the second contractor price that repair before you compare totals.

How to compare two kitchen estimates

CheckWhat to look for
Drawings and scopeBoth estimates refer to the same plan and elevations and cover the same rooms and surfaces
Materials and installationCabinet tier, appliance models, slab and fabrication, fixtures, and responsibility for delivery and installation
Site work and repairsDemolition, disposal, floor preparation, plaster patching, trim matching, and repairs at room transitions
Allowances and exclusionsA clear description of each placeholder, what it includes, and who carries excluded work
Permits and oversightWho handles permits, schedules the trades, walks the site, and checks work against the drawings
Changes and scheduleA written approval process, schedule assumptions, and who tells you when changes affect the finish date
Qualifications and built workRegistration where applicable, insurance certificates, and a portfolio of kitchens the contractor built

What this means for you: Ask for a written revision when a difference affects scope. If one estimate assumes the kitchen floor can stay and the other includes repairs at the new opening, you should be able to point to that difference and see how it affects the total.

How do you get a real number before committing to construction?

  1. Start at the house. Tell us how you cook, where people gather, and which part of the room causes the most trouble. Jan gives you a candid first read on what the house can accommodate and which conditions need a closer look. We agree to a defined design scope and fee structure in writing before design begins. Construction is normally priced and contracted separately. See how interior designers charge.
  2. Draw the plan and elevations to scale. The plan shows how you move through the room. The elevations show how the cabinets, appliances, and trim line up on each wall. This is the stage to test the island, adjust the opening, or change a cabinet run while the work is still on paper.
  3. Make selections and price the defined scope. We choose materials and fixtures together, specify the appliances, and use the drawings and selections to build an itemized estimate. Ask which conditions are verified, which are assumed, and which items still carry an allowance. A firm price offered before drawings exist is a guess, usually protected by exclusions.
  4. Build from the approved set. Jan runs the construction, tracks orders, and checks installation against the drawings. If site conditions require a change, you’ll see the proposed work, cost, and schedule impact before you authorize it.

If you already have a builder, Chateau Concepts also offers remodel and renovation design on its own and hourly remodeling consulting for homeowners who want help with their plan and selections. With our design and build service, Jan handles both the design and general contracting. Call 214-797-4657 or book a design consultation. Bring the changes you’re considering, especially if you’re weighing a refresh against opening the breakfast room.

Frequently asked questions

Can you price my kitchen from photos?
Photos help us see the current layout and finishes. A real construction estimate needs a defined scope, scaled drawings, selections, and a look at the house. The wall framing and utility routes can affect what the photos suggest is possible.
How long does kitchen design and construction take?
Plan on 6 to 12 weeks for design and selections and 6 to 12 weeks for on-site construction. Cabinetry takes 6 to 16 weeks from approval depending on the tier, and custom millwork typically takes 10 to 16 weeks to make. Counter templating starts after the cabinets are installed, with another 2 to 4 weeks from template to installation. See kitchen remodeling in Dallas.
Will I have a working kitchen during construction?
Plan to be without a working kitchen during construction. Ask when the sink, cooking appliances, and refrigerator will be disconnected and at what point the new ones can be used.
Can we move the sink into an island?
That depends on the plumbing route and the slab. Moving a sink on a slab can mean cutting concrete, and a post-tension slab requires care around the cables. We locate the existing plumbing before drawing the proposed move.
Who pulls the permits?
Jan pulls the permits when Chateau Concepts is the general contractor. Highland Park and University Park each issue their own permits. With a design-only engagement, confirm permit responsibility with the builder you hire.
Can I hire Chateau Concepts if I already have a contractor?
Yes. We offer design-only engagements and hourly remodeling consulting for homeowners who want help with the plan and selections for their own builder.
How do I start getting a price for my kitchen?
Start with an in-home consultation so Jan can see the rooms, hear what you want to change, and explain which design fee approach fits your project. Call 214-797-4657 or book a design consultation. See schedule a consultation.
Jan Revels, ASID Allied Professional Interior Designer
ASID, American Society of Interior Designers, Allied Professional Interior Designer · Chateau Concepts, Dallas

Jan has practiced interior design in Dallas since 1997 and founded Chateau Concepts in 2001. She holds a BFA in Interior Design from the University of North Texas. She designs and general-contracts residential and commercial projects across the Park Cities, Preston Hollow and North Dallas. Read her full profile →

Written and reviewed by Jan Revels before publication