General Contracting

The person who drew the plan runs the build. Trades, materials, schedule and quality — held to the standard the drawings set, by the designer who set it.

ASID Allied Professional Interior Designer · Registered with the City of Dallas · Park Cities · Preston Hollow · Dallas
Newly built walk-in shower with a mosaic tile band, bench and frameless glass
Built by Chateau Concepts — waterproofing, tile and glass

In short

Most projects lose something in the hand-off: a designer draws it, someone else builds it, and the details quietly disappear. Jan takes on the general contracting herself — scheduling the trades, ordering and tracking materials, pulling permits, walking the site, and checking the work against the approved plan.

Chateau Concepts, LLC is registered as a general contractor with the City of Dallas and carries general liability insurance — the City requires registered general contractors to be insured. Certificates available on request.

The Proof

Rooms Jan designed — and built

A general contractor should be judged on finished work, not on promises. These are real projects, photographed before and after.

Before on the left · after on the right
Kitchen before and after: dated counters replaced with granite, glass mosaic backsplash and new appliances
KitchenCounters, tile, appliances
Bathroom before and after: tub and sliding doors replaced with a tiled walk-in shower and bench
BathroomTub out, walk-in shower in
Fireplace before and after: red brick surround replaced with stacked stone
FireplaceBrick to stacked stone
Staircase before and after: refinished treads, new railing and flooring
StaircaseTreads, railing, flooring
Media room before and after: reworked walls, finishes and seating
Media RoomWalls, finishes, seating
Master bathroom before and after: rebuilt tub deck, surround and finishes
Master BathTub deck & surround

See every transformation

What Jan takes on

Typical scope

Kitchens and bathrooms, media rooms and fireplace walls, built-ins and custom cabinetry, staircases, wall removals and openings, whole-home renovations, and the finishing trades that make the difference at the end. Structural work is done with a licensed engineer where the scope requires one.

Why It Matters

Four things that go wrong at the seam

Every one of these disappears when one person owns both the drawing and the build.

With a designer and a builderHere
The plan gets value-engineered without you noticing — a cheaper cabinet line, a thinner stone, a substituted fixtureSubstitutions are proposed to you, with the design consequence explained
Something unexpected turns up behind a wall and the crew decides — sensibly, but for buildability, not for the designThe person who designed the room decides, usually the same day
The tile runs the wrong way and each side says the other misread the drawingThere is no other side
You become the project manager by defaultYou do not

The full comparison, including where the traditional split is genuinely the better choice, is in design-build vs hiring separately.

How It Runs

From permit to punch list

Step 1

Drawings & selections

Nothing is scheduled until the plan is approved and every selection is made. Unmade decisions are what delay projects.

Step 2

Permits & ordering

Applications filed with the right jurisdiction, long-lead items ordered first because everything else waits on them.

Step 3

Build & inspect

Trades sequenced by dependency, rough-in inspected before anything is covered, work checked against the drawings.

Step 4

Finish & punch

Fittings, hardware, glass and paint — then a thorough punch list in one pass rather than piecemeal.

If you already have a builder

That works too. Jan regularly designs alongside a client’s own contractor — the important thing is bringing her in early, before the layout is fixed and before materials are ordered, because that is when design decisions still cost nothing to change. See remodeling consulting.

Why Homeowners Choose Jan

Four things that are true here and rare elsewhere

Design and build, one person

Jan designs the space and then runs the build. No hand-off, no two firms blaming each other, and nothing lost between the drawing and the crew.

Drawings before decisions

Floor plans and elevations first, so you see the room before it exists. On paper, changing your mind is free. After the plumbing is run, it is not.

Registered and insured

Chateau Concepts, LLC is registered as a general contractor with the City of Dallas, which requires registered contractors to carry general liability insurance. Certificates available on request.

Since 1997, and personally led

4.9★ from 15 Google reviews. The person you meet at the consultation is the person on site at installation.

Frequently asked questions

Are you licensed and insured?
Chateau Concepts, LLC is registered as a general contractor with the City of Dallas and carries general liability insurance — the City requires registered general contractors to be insured. Certificates are available on request. One thing worth knowing when you compare bids: Texas does not issue a statewide residential general contractor license, so no residential builder in Texas is “state-licensed.” Individual trades such as electrical and plumbing are licensed at state level, and each city sets its own registration requirements. Ask any contractor which city they are registered in, and verify it.
Who pulls the permits?
We do, as part of running the job. You should still be told what was applied for and shown the approved permit. Be cautious of any contractor who asks you to pull permits as the homeowner — it shifts compliance responsibility onto you.
How are changes handled once work has started?
Every change is written, itemized into labor and materials, given a schedule impact in days, and signed before the work happens. Nothing is approved verbally on site. Five small changes at two percent each is ten percent, and it only stays visible if someone is counting.
Can we live in the house during the work?
Usually yes, with containment, protected routes and agreed working hours. Whole-home renovations involving the kitchen and multiple bathrooms at once are the exception — moving out normally shortens the schedule and lowers everyone's stress.
How do payments work?
Payments follow completed work rather than the calendar: a modest deposit to secure the schedule and order long-lead items, progress payments tied to inspected milestones, and a meaningful final payment held until the punch list is genuinely finished.
Everything Else

The rest of what Jan does

One plan, one point of contact

Design and build under one roof means nobody can blame the other side when something is wrong.