Short answer
Hire one firm that designs both rooms as one plan and runs the construction. Chateau Concepts can redesign and build your kitchen and breakfast room together in Highland Park or University Park. Jan Revels, ASID Allied, draws the plans and manages the build. First, we establish whether the dividing wall is structural and whether the pantry stays; then we decide how much to open and where cooking, seating, and circulation belong.
Key takeaways
- Removing the whole wall is one option. A widened cased opening or a better layout within defined rooms may serve the house better.
- Keep the pantry unless the proposed plan gives you a convincing reason to lose it.
- Choose an island, table, or banquette by drawing the working clearances and occupied seating together.
- Structural investigation, town permit review, cabinet lead times, and a temporary kitchen belong in the plan from the start.
- One coordinated design and construction process helps keep structural work, cabinetry, finishes, and scheduling tied to the same drawings.
On this page
- Should the wall between the kitchen and breakfast room come out?
- How should the combined room be laid out?
- What about the pantry and the back door?
- What happens if the wall is load-bearing?
- How do Highland Park and University Park permits differ?
- How long does it take, and how do we keep cooking?
- How do we keep a 1920s house looking like itself?
- Who should design and build the combined room?
- How does Chateau Concepts handle a kitchen and breakfast room remodel?
- Frequently asked questions
Should the wall between the kitchen and breakfast room come out?
Most Highland Park houses date from the 1910s through the 1930s, and most have been altered before. Their kitchens were usually small service rooms at the back, with a pantry, adjoining breakfast room, small windows, and service entrance. They were not planned around an island.
That history explains the cramped feeling, but it does not settle which wall should go. We compare what each opening does for the cooking area, seating, storage, and routes through the house. A useful opening must improve the plan after furniture and cabinets are drawn.
Ways to connect the rooms
| Approach | What it involves | Structure and permit | What you gain | Watch for |
|---|---|---|---|---|
| Open fully | Remove the dividing wall and plan a shared room | If structural, engineer the support and obtain the permit | More freedom to arrange cooking and seating | Lost wall storage, exposed kitchen views, beam position |
| Widen a cased opening | Retain defined edges while enlarging the connection | Structural work may still require engineering and a permit | Better connection with a clear room boundary | Remaining wall sections may limit furniture |
| Keep the wall | Improve each room and its existing connection | Confirm requirements for the actual work | Separate rooms and retained wall space | A cut-off kitchen may remain cut off |
What this means for you: Judge the alternatives by furnished plans, not an empty floor plan. A full opening earns its place when the combined room works better than either a widened opening or improved separate rooms.
In University Park, the kitchen, breakfast room, and family room are often one planning problem. “The kitchen is cut off” may describe a wall to the breakfast room, but the solution affects all the connected spaces. We draw them together before fixing cabinet positions.
Opening to the dining room needs its own justification. Our approach to open plan or defined rooms asks what the house gains from each connection; proximity alone is not a reason to remove a wall.
How should the combined room be laid out?
Begin with the route through the room. Someone going to the back door or breakfast table should not have to thread between an open dishwasher and the person cooking. Draw the furniture, appliance doors, and occupied seats before deciding an island fits.
An island works when it provides useful preparation space and leaves adequate aisles. A kitchen table works when comfortable meals matter more than another fixed cabinet. A banquette can place dining seating along a wall or under windows, but its table and approach still need room.
Clearances and seating dimensions to put on the plan
| Element | Minimum or stated dimension | Better range or design detail |
|---|---|---|
| Work aisle, one cook | 42 inches | 42–45 inches |
| Work aisle, two cooks | 48 inches | 48–54 inches |
| Aisle where dishwasher opens | 48 inches | Draw the open door |
| Walkway outside the work area | 36 inches | 42 inches |
| Island opposite a wall oven | 48 inches | Check the appliance relationship |
| Island depth | 42–48 inches | Seating overhang on one side; deeper centers become unreachable |
| Banquette finished seat | 18 inches high | Frame 14–15 inches plus compressed cushion |
| Dining seat depth | 18–20 inches | Account for the back cushion |
| Seat width | 24 inches per person | An L-shaped corner counts as half a seat |
| Banquette back | 14–18 inches above seat | Back angle 5–10 degrees |
| Table relationship | Table height 30 inches | Table edge to seat front 10–12 inches |
| Toe recess | 3 inches deep | 4 inches high |
What this means for you: An island must pass the aisle test before it becomes part of the design. Banquette dimensions describe usable seating, so cushions, corners, and the table base must appear on the drawing.
No single number covers an island beside an occupied breakfast table. We identify whether that space functions as a work aisle or walkway, then draw chairs pulled out and people seated. A measurement to the table edge alone misses the space diners occupy.
Our guide to kitchen island design and sizing helps frame that decision. If the island leaves an awkward dining area, we compare a smaller island, a table-centered room, and a banquette layout.
For banquettes, a pedestal table makes getting in and out easier to plan. Drawers in the base are more useful than a lift-up lid because stored items remain accessible without lifting the seat.

See our window seats and banquettes guide for the seating details. Comfort depends on the finished dimensions, not just the appearance of the millwork.
What about the pantry and the back door?
The pantry generally stays because it is almost always worth keeping. Removing it may make the floor plan look open while forcing food, small appliances, and serving pieces into the cooking cabinets. We identify where those items will go before approving a pantry loss.
The useful question is how the pantry serves the new layout. Can you reach it without crossing the busiest cooking position? Does its door interfere with the refrigerator, seating, or route outside? An improved entrance may solve more than removing the enclosure.
A pantry also needs a defined purpose. Food storage and a separate preparation area place different demands on the plan. Our butler’s pantry and scullery design guide helps distinguish those uses before cabinetry is selected.
The old service entrance deserves the same attention. A mudroom-style drop zone may work if the site supports it, but hooks and built-ins must not constrict the doorway or breakfast seating. We study the actual arrival route and available wall space before assigning that function.
Bring those daily-use concerns into the first conversation. Call 214-797-4657 or book a design consultation so we can discuss the kitchen, pantry, breakfast room, and back-door connection as one project.
What happens if the wall is load-bearing?
Assume the wall is structural until a professional establishes otherwise. Before drawing the final layout, we also establish where the plumbing stack and gas line run. Those conditions can change the cost substantially and are far cheaper to discover on paper than during demolition.
A structural opening is a sequence of investigation, design, construction, and inspection:
- Investigate. Open the ceiling to understand the existing structure.
- Engineer the support. A structural engineer sizes the beam, posts, and load path.
- Obtain the permit. Include review in the schedule.
- Install temporary shoring. Support the structure before removing the wall.
- Remove the wall and install the beam. This is usually one intense day.
- Complete posts and the load path to the foundation. The beam needs support beneath it.
- Inspect before covering. Leave required work visible for inspection.
- Reroute services and make good. Address wiring, plumbing, and ducts, then finish both sides.
Posts and the load path, along with service rerouting, are where budgets move. A flush beam hides within the ceiling; a dropped beam sits below it. That choice belongs in the structural and interior design discussion because it affects the finished connection.
Foundation type also matters when moving a sink. Pier-and-beam construction leaves a crawl space for rerouting plumbing. A slab, especially post-tension, means cutting concrete to move a drain, dramatically changing the cost of that decision.
Our guide to removing a load-bearing wall explains the work behind the opening. The demolition day is only part of the project.

How do Highland Park and University Park permits differ?
Highland Park and University Park are separate towns from Dallas and from each other. Each issues its own permits and conducts its own inspections. Preston Hollow and North Dallas fall under the City of Dallas, so the property’s jurisdiction sets the review process.
For a load-bearing opening in Highland Park, plan for engineering, a permit, and inspection. Confirm the town’s requirements against the actual scope before construction. A kitchen project can involve more than the opening itself, including plumbing, electrical work, and changes elsewhere in the connected rooms.
Since January 1, 2025, every University Park building permit application goes through a mandatory completeness meeting with the Building Permit Office. The meeting checks whether the documents are complete; an incomplete application is rejected. Document readiness therefore belongs in the schedule before review begins.


Both towns allow construction Monday through Saturday, 7 a.m. to 6 p.m. (Highland Park on its Building Inspection page, University Park in its job site rules). Those limits affect trade scheduling and deliveries. Neither town’s review period should be treated as spare time that construction can absorb.
For kitchen remodeling in Highland Park and University Park, we account for the town process alongside design and procurement. The permit strategy should follow the full scope, especially when the kitchen, breakfast room, and family room are connected.
How long does it take, and how do we keep cooking?
A workable schedule distinguishes design, ordering, review, and construction. It also recognizes dependencies: counters cannot be templated until the cabinets are in place.
Kitchen remodel schedule
| Stage | Stated duration | What controls the next step |
|---|---|---|
| Design and selections | 6–12 weeks | Resolve layout, appliances, cabinetry, and finishes |
| Cabinetry lead time from approval | 6–16 weeks | Stock, semi-custom, or custom cabinetry |
| Town permit review | Added to the schedule | Jurisdiction, scope, and application completeness |
| On-site construction | 6–12 weeks | Coordinate structural work, services, installation, and finishes |
| Counter template to installation | 2–4 weeks | Starts after cabinets are installed |
What this means for you: These ranges are planning stages, not a promise that every project follows the same calendar. Some work can overlap, while dependent tasks must wait; town review is added from the start.
The decision order protects that schedule. Resolve the layout and what moves first, then appliances, cabinetry, counters and backsplash, and lighting. Appliances set cabinet openings; changing a range location affects the gas line; opening a wall can change both the layout and structural work.
Living through the work is hard without a functioning kitchen. Plan a temporary setup before demolition, with a place to prepare simple meals, store everyday food, and wash what you use. Its location must remain practical while trades need access to the construction area.
Discuss which appliances can remain usable and when they must be disconnected. Pack the items needed for daily meals separately from stored kitchen contents. The temporary arrangement should be part of the construction conversation, not a scramble after the sink disappears.
How do we keep a 1920s house looking like itself?
An improved plan should still belong to the house. Simple cabinetry, restrained hardware, and a calm counter sit comfortably in a 1920s interior. A highly styled contemporary kitchen can fight the original rooms around it.
Original hardwood floors, solid doors, and trim profiles are usually kept. When we create an opening, its surround should match the existing trim. That detail helps the kitchen and breakfast room read as connected parts of the home.
The same judgment applies to built-ins. A breakfast bench should relate to the windows and surrounding woodwork, with useful drawers and comfortable cushions. Its proportions matter as much as the cabinet finish.

We also review views from adjacent rooms before selecting finishes. A counter that looks quiet in a sample may cover a large visible area in the combined plan. Elevations help clients judge those relationships before ordering.
Who should design and build the combined room?
A combined kitchen and breakfast room needs someone responsible for the whole plan. Cabinet layouts alone do not resolve structure, room connections, dining furniture, trim, lighting, and the route to the back door.
A firm providing design and construction can carry those decisions through one coordinated process. The person responsible for the drawings also sees how changes affect trade schedules, ordering, and site work. That continuity is especially useful when removing a wall changes several rooms.
A separate designer and builder can also be a sound arrangement when responsibilities are clear. Establish who resolves drawing questions, approves changes, coordinates selections, and checks that construction follows the plan. Homeowners with their own builder can use design-only services or hourly remodeling consulting.
A cabinet showroom can help with cabinet selection and configuration. Before relying on that service for the whole project, establish who handles structural investigation, engineering coordination, permits, and construction beyond the cabinetry.
When choosing an interior designer in the Park Cities, ask to see how the floor plan becomes elevations and then built work. The relevant comparison is the complete responsibility each proposal includes.
How does Chateau Concepts handle a kitchen and breakfast room remodel?
Jan Revels, ASID Allied, has practiced interior design in Dallas since 1997 and founded Chateau Concepts, LLC in 2001. Jan holds a BFA in Interior Design from the University of North Texas. Our work joins design decisions with responsibility for building them.
Jan draws the floor plan and elevations, chooses finishes with the client, then runs construction as general contractor. We schedule trades, order and track materials, walk the site, and hold the work to the drawings. Those tasks connect the approved layout to the finished kitchen.
For this project, we begin with the wall, pantry, service routes, and connected rooms. Then we compare workable layouts before committing to appliances and cabinetry. Banquettes, window seats, and other built-ins are designed as part of the room.
Chateau Concepts, LLC is registered with the City of Dallas as a general contractor and carries general liability insurance; certificates are available on request. Our kitchen remodeling in Dallas services include design and build, with design-only engagements and hourly consulting available for homeowners using their own builder.
Call 214-797-4657 or book a design consultation at our contact page. We can help you decide what should open, what should stay, and how the kitchen and breakfast room should work together.
Frequently asked questions
Should I take down the wall between my kitchen and breakfast room?
Do I need a permit to open a kitchen wall in Highland Park?
Is a banquette or a table better in a breakfast room?
How much clearance does an island need next to a breakfast table?
Should we keep the pantry?
Can we stay home during construction?
Can Chateau Concepts work with our builder?
Work with Chateau Concepts
Jan Revels handles both sides of a project in Dallas and the Park Cities — the design and the build.