What interior design costs in Dallas

Nobody can price your project from an article. What can be described honestly is where the money goes, which parts move when you push on them, and how to read two proposals that are quoting different work.

Budget · 8 min read · Written & reviewed by Jan Revels, ASID · designing in Dallas since 1997

Short answer

There is no honest single figure, because the same square footage can be a paint-and-furnishings project or a moved-walls project. What is stable is the shape of a budget: in a remodel, construction labor and cabinetry usually dominate; in a furnishing project, upholstery and window treatments do.

The three costs people forget are freight and receiving, window treatments, and the contingency. Together they are large enough to derail a budget that ignored them.

To get a real number you need a defined scope and drawings. Anyone quoting a firm price before those exist is quoting a guess, and the guess is usually protected by exclusions.

What does a design budget actually look like?

Absolute numbers vary too much to publish responsibly. Proportions are far more stable, and more useful, because they tell you where attention is worth spending.

Project typeLargest shareSecondUsually underestimated
Kitchen remodelCabinetry and installationLabor and tradesAppliances, lighting, stone fabrication
Bathroom remodelLabor and tradesTile, stone and fixturesWaterproofing, ventilation, glass
Whole-room furnishingUpholstery and case goodsWindow treatmentsFreight, receiving, delivery, installation
Whole-house furnishingUpholsteryRugs and window treatmentsLighting and accessories, which finish the job
Addition or structural changeStructure and envelopeMechanical, electrical, plumbingPermitting, engineering, temporary conditions

Two patterns fall out of that table. First, labor is a bigger share than most people expect in anything involving construction — often larger than the materials people spend all their time choosing. Second, the finishing layer is systematically underfunded: window treatments, lighting and rugs are the items most often cut, and they are precisely the items that make a room look finished rather than furnished.

The five things that move the number most

  1. Whether anything moves. Keeping plumbing and walls where they are is the single largest lever in any remodel. Moving a toilet or relocating a range changes the trade count, the permit scope and the schedule at once.
  2. The age of the house. A house built before 1980 carries a higher probability of surprises behind the walls — wiring, galvanized supply, framing that was modified once already. This is why contingency sizing is not optional; see change orders and budget control.
  3. Custom versus stock. Custom cabinetry, made-to-measure drapery and one-off millwork cost more and fit spaces stock cannot. In older Dallas houses with irregular runs, custom is often the only thing that fits — see the built-ins and cabinetry guide.
  4. Quality of the specification. Not the brand, the specification. A door on a good box with good hardware outlasts a better-looking door on a worse box.
  5. The number of decisions still open when work starts. This is the sleeper. Every unmade decision at the start becomes a change order later, and change orders price at a premium.
Get the number before the drawings

The fastest way to find out what your project costs is to walk it with someone who both designs and builds — and who has to stand behind the estimate afterwards.

Jan Revels prices what she draws, in Dallas and the Park Cities. If the list does not fit the range, she will say which item to cut.

The costs almost everyone forgets

Which parts genuinely flex?

When a project comes in over, these are the levers, in the order they usually cost you least:

  1. Phase it. Do fewer rooms properly rather than all of them thinly. The method is in whole-home design phasing.
  2. Change the finish, not the layout. A different tile is a substitution. A different plan is a redesign.
  3. Keep the plumbing. Reconsider whether the fixtures really need to move.
  4. Mix cabinetry tiers. Custom where the run is irregular or highly visible; semi-custom where it is a straight wall behind a door.
  5. Delay the soft layer — accessories, secondary seating — rather than downgrading the frames and cabinetry you will live with for twenty years.

What rarely pays: cutting waterproofing, ventilation, electrical capacity or structural work. These are invisible, expensive to revisit, and the reason a bathroom fails five years later.

What is specific to Dallas

Comparing two proposals fairly

Two proposals for the same house routinely differ substantially, and it is almost never because one firm is cheap. Check these before comparing totals:

Key takeaways

  • Proportions travel; absolute figures do not. Learn where the money goes in your project type.
  • Labor is a larger share than most people expect in anything structural.
  • Freight and receiving, window treatments and contingency are the three most common omissions.
  • Not moving plumbing and walls is the single biggest saving available in a remodel.
  • Never cut waterproofing, ventilation or electrical capacity to make a number work.
  • Compare proposals on allowances, scope and exclusions before comparing totals.

Frequently asked questions

How much should I budget for interior design in Dallas?
It depends far more on scope than on square footage: a paint-and-furnishings refresh and a walls-moved remodel of the same room are different projects with different budgets. The practical approach is to set a range you are comfortable with, describe the full wish list, and have a designer tell you what fits inside it. That conversation takes one meeting and is far more useful than any published average.
Why do two contractors quote such different prices?
Usually because they are quoting different work. Check the allowances first — a low tile or fixture allowance produces a low total that will rise later. Then check scope, who is buying fixtures, whether permits and management are included, and whether a contingency line exists. A proposal that includes a contingency looks more expensive and is generally more honest.
How big should my contingency be?
It scales with uncertainty rather than with budget. New construction that is fully specified carries the least risk; a remodel in a house built before 1980 carries the most, because wiring, plumbing and previous modifications are unknown until walls open. The full guidance is in change orders and budget control. What matters is that the line exists before work starts, not after.
Is it cheaper to buy furniture myself?
Sometimes on the sticker, rarely over the life of the room. Designers buy at trade pricing, and depending on the fee model some or all of that reaches you. More significantly, pieces bought individually in the wrong scale get replaced within a few years, which is the largest hidden cost in a self-furnished house. Where you clearly do save is on items you would have bought correctly anyway.
Can I do a remodel in phases to spread the cost?
Yes, and it is a sound strategy provided a master plan exists first. Without one, phase two spends money undoing phase one — a floor stops in the wrong place, a paint palette no longer matches, an electrical panel needs revisiting. Do the disruptive and infrastructural work first, then finish rooms in order. The sequence is set out in whole-home design phasing.
Jan Revels, ASID Allied Professional Interior Designer
ASID Allied Professional Interior Designer · Chateau Concepts, Dallas

Jan has practiced interior design in Dallas since 1997 and founded Chateau Concepts in 2001. She holds a BFA in Interior Design from the University of North Texas. She designs and general-contracts residential and commercial projects across the Park Cities, Preston Hollow and North Dallas. Read her full profile →

Written and reviewed by Jan Revels before publication

Want a real number?

Bring the rooms and a range. Jan will tell you what fits inside it and what does not, before any drawings are made.

Book a Design Consultation