Who remodels a laundry room and bathroom together in the Park Cities?

When it pays to do both rooms at once, the three ways they can sit together, what each needs on the plan, leak and vent protection, each town’s permit, the schedule, and who should design and build it.

Remodeling · 14 min read · Written & reviewed by Jan Revels, ASID Allied, American Society of Interior Designers · designing in Dallas since 1997
Published

Short answer

Hire one firm that designs both rooms on one plan and runs the plumbing, electrical, venting, tile, and cabinetry as one job. We do that at Chateau Concepts in Highland Park and University Park. Remodeling both at once makes sense when the rooms share a wall, plumbing routes, or enough trade work to justify one construction period. Start with the drain and vent routes, then decide whether to keep the rooms separate, combine them, or move the laundry upstairs.

Key takeaways

Is it worth remodeling the laundry and the bathroom at the same time?

It is usually worth planning the rooms as one job when opening a wall gives the plumber access to both. A shared wet wall, the wall that carries the plumbing, can put a laundry sink and washer near bathroom supply and drain lines. The floor plan can suggest that opportunity, but the existing pipe locations and the route to the drain determine what you can actually share.

The work can also share a set of trades. We can sequence plumbing and electrical rough-in for both rooms, coordinate tile and cabinetry, and plan one period of disruption. If the local building office can review the rooms under one building permit, we can submit them as one scope. We confirm that with the office before setting the schedule.

Rooms at opposite ends of the house may have independent pipe routes, separate demolition areas, and little work to combine. If doing both together also takes away the only usable bathroom or piles a laundry shutdown on top of it, phasing can be the better choice. Compare which walls would open, which trades would make repeat trips, and how you’d handle showers and laundry during the work.

For a plan grounded in your house, call 214-797-4657 or book a design consultation. Bring the changes you want in each room and tell us which fixtures or machines you’re open to moving.

Which of the three arrangements fits your house?

Laundry and bathroom layout comparison

ArrangementWhat it involvesWhat you gainWatch for
Separate rooms sharing a wallPut laundry connections and bathroom fixtures along a common plumbing wall where the existing routes allow.Separate doors and privacy, with the possibility of shared rough-in access.Check the pipe locations before counting on savings. Check where both doors swing and where the dryer can vent.
Laundry inside a pool bath or hall bathSet machines under a counter or stack them beside the bath fixtures. Plan a path through the room that stays open during laundry.A washer close to wet towels and a counter that can serve both uses.An open washer door or basket can block the sink or toilet. A closed bathroom door also means the laundry is temporarily unavailable.
Laundry moved near the bedroomsFind room for the machines and a working surface upstairs, then establish drain, supply, power, and exhaust routes.Less carrying between hampers, the washer, and bedroom closets.Check the exterior vent route, washer leak protection, and sound through walls and floors before committing.

What this means for you. Choose based on who uses the rooms at the same time and how the utilities can reach them. A shared wall can support separate rooms beautifully, and a combined room earns its space when daily use of the bath and laundry can overlap without crowding.

In a pool bath, we look at the path from the outside door to the sink and toilet while someone is loading the washer. In a hall bath, we look at how the family uses the room when someone needs privacy. Upstairs, we start with where the baskets will sit and trace the dryer duct to the exterior before designing cabinets around the machines.

What does each room need on the plan?

A laundry follows a sequence: sort, wash, dry, hang, fold, and put away. Give each task a place, including somewhere to set a basket while the machine doors are open. A hanging rod and folding counter are the pieces we most often find missing. In the bath, start with fixture placement and clearances, then work through storage and finishes.

Laundry dimensions and bathroom planning checks

Laundry itemAllow on the laundry planBathroom essential to check alongside it
Machine spacing1 inch on either side of each machine and 1 inch between machinesRoom to approach and use each fixture, with doors and drawers open
Machine depthActual machine depth plus 6 inches for hoses, vent, and connectionsDrain and supply routes behind or below fixtures
Clear floor in front36 inches minimum, or 42 inches if a door swings into itClear paths between the entry, vanity, toilet, and shower or tub
Counter over front-loaders36 to 38 inches high, verified against the machines, and 25 inches deepVanity sized to the room and the way you use it
Folding surface36 inches minimum length, with 48 to 60 inches comfortableCounter space for daily items and storage for what should go away
Hanging and upper cabinetsRod 66 to 72 inches high, at least 3 feet long, with 12 inches minimum to the wall. Upper cabinets 18 inches above the counter.Towel storage and blocking for towel bars, grab bars, and wall-hung fixtures

What this means for you. Use these dimensions to test the layout with the actual appliance specifications in hand. Then look at the plan with appliance doors, cabinet doors, and bath doors all drawn open so you can spot conflicts before cabinetry goes into production.

Front-loaders under one continuous counter usually give you the most useful folding surface. In a narrow closet or hall laundry, a stack can make room for a fold-down shelf or a short counter. A combination washer-dryer can work in a primary closet or guest suite with space for only one machine. Choose the appliance first and check the door swing against the walls, cabinetry, and the place you’ll stand. See our laundry room design guide.

Bathroom before and after: on the left, a bathtub with frosted sliding glass doors; on the right, a tiled walk-in shower with a bench, a mosaic tile panel, a wall niche and a rain shower head, beside a dark wood linen cabinet
A Chateau Concepts bathroom, before and after: the tub and sliding doors became a tiled walk-in shower with a bench and a niche, with a linen cabinet beside it. When the laundry next door is remodeled in the same job, the walls are open once for both rooms.

We draw the sink, tall cupboard, outlets, and lighting on the laundry elevations. A deep sink earns its space if you wash boots, fill mop buckets, arrange flowers, or bathe the dog. In an older bath where a stock vanity fits awkwardly, bathroom vanities and storage can be designed around the room’s shape. Put blocking in while the walls are open, when it costs almost nothing.

Where does the space come from in an older Park Cities house?

Many older Park Cities houses have fewer and smaller bathrooms than families expect today. Most Highland Park houses date from the 1910s through the 1930s, and most have already been altered. We survey what’s there before we draw. Borrowing 18 inches from an oversized closet can give a cramped bathroom a workable layout without adding onto the house.

  1. Decide whether the bathroom plumbing moves. That’s the first bathroom question and the largest single cost variable. Start with the existing drain locations and see how much the room improves with those positions in place.
  2. Check the foundation and access. Pier-and-beam construction gives the plumber a crawl space and comparatively straightforward rerouting. Moving a drain in a slab means cutting concrete, so that choice affects demolition and the work needed to put the floor back.
  3. Test the space you’re borrowing. Draw the remaining closet, the new bathroom wall, and both door swings. If the laundry is part of the same plan, show where the machine connections, exhaust duct, and cabinets land before committing to the wall move.

Sometimes a closet strip is enough to make the bath work while the laundry stays next door. If the new bath layout only works with a relocated drain, compare that scope with what you get from keeping those fixtures where they are. Our Park Cities renovation guide covers the broader house planning.

How do you keep water where it belongs?

In the bath, we plan the waterproofing as an assembly. The shower needs cement or foam board, a continuous membrane, a correctly sloped pan, and flexible movement joints at every change of plane, such as the wall-to-floor junction. Ask to see the membrane before tile covers it. Photograph every open wall before it’s closed so you have a record of where plumbing and blocking went.

Screenshot of the Chateau Concepts bathroom remodeling page showing the Highland Park, University Park and Preston Hollow section and The part you will never see, with the paragraph about seeing the membrane before tile highlighted
From our bathroom remodeling page, “The part you will never see.” Look at the highlighted paragraph: waterproofing is the easiest thing to cut because nobody can tell once the tile is on, so ask to see the membrane and photograph every open wall before it is closed. Screenshot: chateauconcepts.com/services/bathroom-remodeling, November 2026.

In the laundry, put a pan under the washer, ideally with a drain. Use braided stainless supply hoses and a single-lever shutoff you can reach with the machines installed. A leak sensor adds a way to catch a problem early. These details are especially important upstairs, where a washer leak can reach the rooms below.

We specify plywood cabinet boxes because laundry cabinetry can get wet, and we put tile where water lands. For a pool bath, check floor tile for slip resistance with wet feet in mind. Decide on grout against a wet sample board so you can judge it under conditions closer to daily use. Read more about bathroom tile selection.

How do you handle venting, moisture, and noise?

Draw the dryer exhaust route while the layout is still open to change. It needs to reach the exterior through rigid metal duct, as short and straight as possible. Every elbow reduces performance, and a long flexible run is inefficient and poses a fire risk. If a closet near the bedrooms only works with a difficult duct route, check another location before committing to that closet.

A bathroom exhaust fan serves a different job. Size it to the room, duct it outdoors, and put it on a timer or humidity sensor. Air-drying clothes adds moisture, too, especially in a small room with the door closed. In a combined bath and laundry, plan extraction for the way you’ll actually use the shower and the hanging rod.

When the laundry shares a wall with a bedroom or living room, use insulated walls and a solid-core door. Consider when you normally run the washer and what’s on the other side of the wall. A plan that keeps the machines away from the bed wall may work better for the household even if both locations fit on paper.

Which permit process applies in Highland Park or University Park?

Highland Park and University Park each issue their own permits and run their own inspections. Start with the office for the address and describe both rooms, including fixture moves and changes to walls, electrical, and venting. Ask whether both rooms can be included in one building permit and what trade permits or inspections the work requires. Preston Hollow and North Dallas are in the City of Dallas.

Highland Park. The Town says the property owner is responsible for making sure the permit is obtained and contractors must be registered with the Town. Construction hours are Monday through Saturday, 7 a.m. to 6 p.m.

Screenshot of the Town of Highland Park Building Inspection page with the Permit Application paragraph and the Working Hours paragraph highlighted
The Town of Highland Park’s Building Inspection page. The highlighted paragraphs: the property owner is responsible for making sure a permit is obtained, contractors must be registered with the Town, and construction is allowed Monday through Saturday, 7 a.m. to 6 p.m. Screenshot: hptx.org, November 2026.

University Park. Since January 1, 2025, every building permit application goes through a mandatory completeness meeting with the Building Permit Office. An incomplete application is rejected, so allow time to assemble the submission before formal review. Job site hours are Monday through Saturday, 7 a.m. to 6 p.m.

Screenshot of the City of University Park Building Permits page with the mandatory application meeting paragraph and the remodeling packet paragraph highlighted
The City of University Park Building Permits page: since January 1, 2025 every application is checked for completeness in a mandatory meeting, and the Residential Plan Submittal Packet applies to remodeling projects, not only new homes. Screenshot: uptexas.org, November 2026.
Screenshot of the City of University Park Job Site Rules page listing construction work hours, site conditions, deliveries, worker parking and neighbor notification, with the work hours and neighbor notification items highlighted
The City of University Park Job Site Rules page. Look at the two highlighted items: construction work hours are 7 am to 6 pm, Monday through Saturday, and before work starts an announcement of who is building goes to all 8 immediate neighbors. Screenshot: uptexas.org, November 2026.

How long does a combined remodel take?

Bathroom time ranges and shared scheduling decisions

StageTypical durationWhat it means for the combined job
Bathroom design and selections4–8 weeksResolve the layout, plumbing moves, appliance specifications, and finishes before orders go in.
Permit reviewConfirm with the building officeBuild review time into the schedule from the start.
Custom millwork fabrication10–16 weeksDraw and order laundry cabinetry and any custom vanity early.
Full primary bath construction4–8 weeks on siteCoordinate shared rough-in and tile work around inspections and curing periods.
Powder room construction2–3 weeks on siteUse this range when the bathroom scope is a powder room.
Frameless shower glass2–3 weeks after tile is finished and measuredPlan for the time between finished tile and glass installation.

What this means for you. These ranges describe individual stages, and some can overlap. The laundry adds cabinetry lead time, and its on-site schedule depends on the scope and what the rooms share. We do not quote a duration for a laundry on its own, because it depends on how much plumbing and venting moves; Jan gives you the schedule for your two rooms once the plan is drawn.

Before demolition, decide where you’ll shower and wash clothes during the shutdown. Ask when the washer comes out, when water may be interrupted, and which finishes must cure before a room can be used. Waterproofing and tile setting include curing periods that can’t be compressed. See our guide to living through a remodel.

Who should design and build both rooms?

One design-build firm makes sense when decisions in either room affect the other. The same team can check that a deeper washer still fits under the drawn counter, that its vent clears the cabinetry, and that the bath plumbing can follow the proposed route. Ask who draws the elevations, orders materials, schedules trades, and checks the work against those drawings.

A separate designer and builder can also work if the builder reviews both rooms and the utility routes before orders are placed. With a bath-only remodeler whose scope stops at the bathroom, you’ll need someone to manage the laundry and coordinate any shared wall, shutoff, or inspection. If you already have a builder, we offer design-only engagements and hourly remodeling consulting.

How does Chateau Concepts handle a laundry and bathroom remodel?

Jan Revels, ASID Allied, has practiced interior design in Dallas since 1997 and founded Chateau Concepts, LLC in 2001. Jan holds a BFA in Interior Design from the University of North Texas. For our bathroom remodeling in the Park Cities and bathroom remodeling in Dallas, one team takes primary baths, Jack and Jill baths, and powder rooms from layout to the last fixture.

Jan surveys both rooms, draws the floor plans and elevations, and works through the selections with you. We specify the machines, counter, sink, outlets, lights, and built-ins and cabinetry before building. As general contractor, Jan orders and tracks materials, schedules the trades, walks the site, and checks construction against the drawings. Chateau Concepts, LLC is registered with the City of Dallas as a general contractor and carries general liability insurance. Certificates are available on request.

Our Seascape Laundry/Pool Bath shows how a combined room can work. One stone counter runs over both front-loading machines and the sink, leaving the whole run available for folding. Drawers sit beside the washer, closed cabinets and undercabinet lights serve the work surface, and a bubble-glass mosaic backsplash meets the counter. The floor tile is laid on the diagonal, and the exhaust fan is in the ceiling. More finished rooms are in the portfolio.

Laundry and pool bath with custom cabinetry, a stone counter over a front-loading washer and dryer, a sink, and a bubble-glass mosaic backsplash
Seascape Laundry/Pool Bath, a Chateau Concepts project: one stone counter runs over both front-loading machines and the sink, so the whole run is a folding surface, with drawers beside the washer, closed cabinets above and lights under them.

Frequently asked questions

Can a washer and dryer go in a bathroom?
Yes. A pool bath or hall bath can accommodate laundry if the fixtures, machines, and door swings fit. Plan power, plumbing, exterior dryer venting, and moisture extraction, and confirm the proposed scope with your building office.
Do I need a permit to remodel a bathroom and laundry in Highland Park?
It depends on the work, so confirm it with the Town of Highland Park’s Building Inspection office before anything starts. Highland Park issues its own permits and runs its own inspections, separately from the City of Dallas. Describe both rooms and any changes to plumbing, electrical, venting, or walls. The property owner is responsible for making sure the permit is obtained when required.
Is it cheaper to remodel the laundry and bathroom together?
It can be when the rooms share plumbing access, demolition, or trade visits. The biggest bathroom cost variable is whether the plumbing moves. Rooms with separate utility routes and little shared work may offer limited savings.
Can the laundry move upstairs?
Yes, if the layout supports the washer drain and supplies, power, an exterior dryer vent route, and space to use the machines. Include a washer pan, ideally drained, a leak sensor, and sound control near bedrooms.
Should I buy the washer and dryer before design starts?
Choose the models before the cabinetry is drawn. Use the actual machine dimensions, connection space, and door swings to set the counter height, opening width, and clear floor area.
Can I hire Chateau Concepts if I already have a builder?
Yes. We offer design-only engagements and hourly remodeling consulting for homeowners with their own builder, along with full design and construction. Call 214-797-4657 or book a design consultation.
Jan Revels, ASID Allied Professional Interior Designer
ASID, American Society of Interior Designers, Allied Professional Interior Designer · Chateau Concepts, Dallas

Jan has practiced interior design in Dallas since 1997 and founded Chateau Concepts in 2001. She holds a BFA in Interior Design from the University of North Texas. She designs and general-contracts residential and commercial projects across the Park Cities, Preston Hollow and North Dallas. Read her full profile →

Written and reviewed by Jan Revels before publication