Short answer
Hire one firm that designs both rooms on one plan and runs the plumbing, electrical, venting, tile, and cabinetry as one job. We do that at Chateau Concepts in Highland Park and University Park. Remodeling both at once makes sense when the rooms share a wall, plumbing routes, or enough trade work to justify one construction period. Start with the drain and vent routes, then decide whether to keep the rooms separate, combine them, or move the laundry upstairs.
Key takeaways
- A shared plumbing wall makes a strong case for doing both rooms together. Moving a bathroom drain is the biggest cost variable, so settle that question first.
- Side-by-side rooms preserve privacy, a combined room saves space, and an upstairs laundry puts the machines near the bedrooms. Each calls for a different plan for traffic, moisture, and noise.
- Choose the washer and dryer before drawing the cabinetry. Give hanging and folding as much thought as the machines and sink.
- Highland Park and University Park handle permits and inspections separately. Confirm the permit scope early and build review time into the schedule.
- Jan Revels, ASID Allied, draws both rooms, works through selections with you, and manages construction as general contractor.
On this page
- Is it worth remodeling the laundry and the bathroom at the same time?
- Which of the three arrangements fits your house?
- What does each room need on the plan?
- Where does the space come from in an older Park Cities house?
- How do you keep water where it belongs?
- How do you handle venting, moisture, and noise?
- Which permit process applies in Highland Park or University Park?
- How long does a combined remodel take?
- Who should design and build both rooms?
- How does Chateau Concepts handle a laundry and bathroom remodel?
- Frequently asked questions
Is it worth remodeling the laundry and the bathroom at the same time?
It is usually worth planning the rooms as one job when opening a wall gives the plumber access to both. A shared wet wall, the wall that carries the plumbing, can put a laundry sink and washer near bathroom supply and drain lines. The floor plan can suggest that opportunity, but the existing pipe locations and the route to the drain determine what you can actually share.
The work can also share a set of trades. We can sequence plumbing and electrical rough-in for both rooms, coordinate tile and cabinetry, and plan one period of disruption. If the local building office can review the rooms under one building permit, we can submit them as one scope. We confirm that with the office before setting the schedule.
Rooms at opposite ends of the house may have independent pipe routes, separate demolition areas, and little work to combine. If doing both together also takes away the only usable bathroom or piles a laundry shutdown on top of it, phasing can be the better choice. Compare which walls would open, which trades would make repeat trips, and how you’d handle showers and laundry during the work.
For a plan grounded in your house, call 214-797-4657 or book a design consultation. Bring the changes you want in each room and tell us which fixtures or machines you’re open to moving.
Which of the three arrangements fits your house?
Laundry and bathroom layout comparison
| Arrangement | What it involves | What you gain | Watch for |
|---|---|---|---|
| Separate rooms sharing a wall | Put laundry connections and bathroom fixtures along a common plumbing wall where the existing routes allow. | Separate doors and privacy, with the possibility of shared rough-in access. | Check the pipe locations before counting on savings. Check where both doors swing and where the dryer can vent. |
| Laundry inside a pool bath or hall bath | Set machines under a counter or stack them beside the bath fixtures. Plan a path through the room that stays open during laundry. | A washer close to wet towels and a counter that can serve both uses. | An open washer door or basket can block the sink or toilet. A closed bathroom door also means the laundry is temporarily unavailable. |
| Laundry moved near the bedrooms | Find room for the machines and a working surface upstairs, then establish drain, supply, power, and exhaust routes. | Less carrying between hampers, the washer, and bedroom closets. | Check the exterior vent route, washer leak protection, and sound through walls and floors before committing. |
What this means for you. Choose based on who uses the rooms at the same time and how the utilities can reach them. A shared wall can support separate rooms beautifully, and a combined room earns its space when daily use of the bath and laundry can overlap without crowding.
In a pool bath, we look at the path from the outside door to the sink and toilet while someone is loading the washer. In a hall bath, we look at how the family uses the room when someone needs privacy. Upstairs, we start with where the baskets will sit and trace the dryer duct to the exterior before designing cabinets around the machines.
What does each room need on the plan?
A laundry follows a sequence: sort, wash, dry, hang, fold, and put away. Give each task a place, including somewhere to set a basket while the machine doors are open. A hanging rod and folding counter are the pieces we most often find missing. In the bath, start with fixture placement and clearances, then work through storage and finishes.
Laundry dimensions and bathroom planning checks
| Laundry item | Allow on the laundry plan | Bathroom essential to check alongside it |
|---|---|---|
| Machine spacing | 1 inch on either side of each machine and 1 inch between machines | Room to approach and use each fixture, with doors and drawers open |
| Machine depth | Actual machine depth plus 6 inches for hoses, vent, and connections | Drain and supply routes behind or below fixtures |
| Clear floor in front | 36 inches minimum, or 42 inches if a door swings into it | Clear paths between the entry, vanity, toilet, and shower or tub |
| Counter over front-loaders | 36 to 38 inches high, verified against the machines, and 25 inches deep | Vanity sized to the room and the way you use it |
| Folding surface | 36 inches minimum length, with 48 to 60 inches comfortable | Counter space for daily items and storage for what should go away |
| Hanging and upper cabinets | Rod 66 to 72 inches high, at least 3 feet long, with 12 inches minimum to the wall. Upper cabinets 18 inches above the counter. | Towel storage and blocking for towel bars, grab bars, and wall-hung fixtures |
What this means for you. Use these dimensions to test the layout with the actual appliance specifications in hand. Then look at the plan with appliance doors, cabinet doors, and bath doors all drawn open so you can spot conflicts before cabinetry goes into production.
Front-loaders under one continuous counter usually give you the most useful folding surface. In a narrow closet or hall laundry, a stack can make room for a fold-down shelf or a short counter. A combination washer-dryer can work in a primary closet or guest suite with space for only one machine. Choose the appliance first and check the door swing against the walls, cabinetry, and the place you’ll stand. See our laundry room design guide.

We draw the sink, tall cupboard, outlets, and lighting on the laundry elevations. A deep sink earns its space if you wash boots, fill mop buckets, arrange flowers, or bathe the dog. In an older bath where a stock vanity fits awkwardly, bathroom vanities and storage can be designed around the room’s shape. Put blocking in while the walls are open, when it costs almost nothing.
Where does the space come from in an older Park Cities house?
Many older Park Cities houses have fewer and smaller bathrooms than families expect today. Most Highland Park houses date from the 1910s through the 1930s, and most have already been altered. We survey what’s there before we draw. Borrowing 18 inches from an oversized closet can give a cramped bathroom a workable layout without adding onto the house.
- Decide whether the bathroom plumbing moves. That’s the first bathroom question and the largest single cost variable. Start with the existing drain locations and see how much the room improves with those positions in place.
- Check the foundation and access. Pier-and-beam construction gives the plumber a crawl space and comparatively straightforward rerouting. Moving a drain in a slab means cutting concrete, so that choice affects demolition and the work needed to put the floor back.
- Test the space you’re borrowing. Draw the remaining closet, the new bathroom wall, and both door swings. If the laundry is part of the same plan, show where the machine connections, exhaust duct, and cabinets land before committing to the wall move.
Sometimes a closet strip is enough to make the bath work while the laundry stays next door. If the new bath layout only works with a relocated drain, compare that scope with what you get from keeping those fixtures where they are. Our Park Cities renovation guide covers the broader house planning.
How do you keep water where it belongs?
In the bath, we plan the waterproofing as an assembly. The shower needs cement or foam board, a continuous membrane, a correctly sloped pan, and flexible movement joints at every change of plane, such as the wall-to-floor junction. Ask to see the membrane before tile covers it. Photograph every open wall before it’s closed so you have a record of where plumbing and blocking went.

In the laundry, put a pan under the washer, ideally with a drain. Use braided stainless supply hoses and a single-lever shutoff you can reach with the machines installed. A leak sensor adds a way to catch a problem early. These details are especially important upstairs, where a washer leak can reach the rooms below.
We specify plywood cabinet boxes because laundry cabinetry can get wet, and we put tile where water lands. For a pool bath, check floor tile for slip resistance with wet feet in mind. Decide on grout against a wet sample board so you can judge it under conditions closer to daily use. Read more about bathroom tile selection.
How do you handle venting, moisture, and noise?
Draw the dryer exhaust route while the layout is still open to change. It needs to reach the exterior through rigid metal duct, as short and straight as possible. Every elbow reduces performance, and a long flexible run is inefficient and poses a fire risk. If a closet near the bedrooms only works with a difficult duct route, check another location before committing to that closet.
A bathroom exhaust fan serves a different job. Size it to the room, duct it outdoors, and put it on a timer or humidity sensor. Air-drying clothes adds moisture, too, especially in a small room with the door closed. In a combined bath and laundry, plan extraction for the way you’ll actually use the shower and the hanging rod.
When the laundry shares a wall with a bedroom or living room, use insulated walls and a solid-core door. Consider when you normally run the washer and what’s on the other side of the wall. A plan that keeps the machines away from the bed wall may work better for the household even if both locations fit on paper.
Which permit process applies in Highland Park or University Park?
Highland Park and University Park each issue their own permits and run their own inspections. Start with the office for the address and describe both rooms, including fixture moves and changes to walls, electrical, and venting. Ask whether both rooms can be included in one building permit and what trade permits or inspections the work requires. Preston Hollow and North Dallas are in the City of Dallas.
Highland Park. The Town says the property owner is responsible for making sure the permit is obtained and contractors must be registered with the Town. Construction hours are Monday through Saturday, 7 a.m. to 6 p.m.

University Park. Since January 1, 2025, every building permit application goes through a mandatory completeness meeting with the Building Permit Office. An incomplete application is rejected, so allow time to assemble the submission before formal review. Job site hours are Monday through Saturday, 7 a.m. to 6 p.m.


How long does a combined remodel take?
Bathroom time ranges and shared scheduling decisions
| Stage | Typical duration | What it means for the combined job |
|---|---|---|
| Bathroom design and selections | 4–8 weeks | Resolve the layout, plumbing moves, appliance specifications, and finishes before orders go in. |
| Permit review | Confirm with the building office | Build review time into the schedule from the start. |
| Custom millwork fabrication | 10–16 weeks | Draw and order laundry cabinetry and any custom vanity early. |
| Full primary bath construction | 4–8 weeks on site | Coordinate shared rough-in and tile work around inspections and curing periods. |
| Powder room construction | 2–3 weeks on site | Use this range when the bathroom scope is a powder room. |
| Frameless shower glass | 2–3 weeks after tile is finished and measured | Plan for the time between finished tile and glass installation. |
What this means for you. These ranges describe individual stages, and some can overlap. The laundry adds cabinetry lead time, and its on-site schedule depends on the scope and what the rooms share. We do not quote a duration for a laundry on its own, because it depends on how much plumbing and venting moves; Jan gives you the schedule for your two rooms once the plan is drawn.
Before demolition, decide where you’ll shower and wash clothes during the shutdown. Ask when the washer comes out, when water may be interrupted, and which finishes must cure before a room can be used. Waterproofing and tile setting include curing periods that can’t be compressed. See our guide to living through a remodel.
Who should design and build both rooms?
One design-build firm makes sense when decisions in either room affect the other. The same team can check that a deeper washer still fits under the drawn counter, that its vent clears the cabinetry, and that the bath plumbing can follow the proposed route. Ask who draws the elevations, orders materials, schedules trades, and checks the work against those drawings.
A separate designer and builder can also work if the builder reviews both rooms and the utility routes before orders are placed. With a bath-only remodeler whose scope stops at the bathroom, you’ll need someone to manage the laundry and coordinate any shared wall, shutoff, or inspection. If you already have a builder, we offer design-only engagements and hourly remodeling consulting.
How does Chateau Concepts handle a laundry and bathroom remodel?
Jan Revels, ASID Allied, has practiced interior design in Dallas since 1997 and founded Chateau Concepts, LLC in 2001. Jan holds a BFA in Interior Design from the University of North Texas. For our bathroom remodeling in the Park Cities and bathroom remodeling in Dallas, one team takes primary baths, Jack and Jill baths, and powder rooms from layout to the last fixture.
Jan surveys both rooms, draws the floor plans and elevations, and works through the selections with you. We specify the machines, counter, sink, outlets, lights, and built-ins and cabinetry before building. As general contractor, Jan orders and tracks materials, schedules the trades, walks the site, and checks construction against the drawings. Chateau Concepts, LLC is registered with the City of Dallas as a general contractor and carries general liability insurance. Certificates are available on request.
Our Seascape Laundry/Pool Bath shows how a combined room can work. One stone counter runs over both front-loading machines and the sink, leaving the whole run available for folding. Drawers sit beside the washer, closed cabinets and undercabinet lights serve the work surface, and a bubble-glass mosaic backsplash meets the counter. The floor tile is laid on the diagonal, and the exhaust fan is in the ceiling. More finished rooms are in the portfolio.

Frequently asked questions
Can a washer and dryer go in a bathroom?
Do I need a permit to remodel a bathroom and laundry in Highland Park?
Is it cheaper to remodel the laundry and bathroom together?
Can the laundry move upstairs?
Should I buy the washer and dryer before design starts?
Can I hire Chateau Concepts if I already have a builder?