Dallas & Park Cities Interior Design & General Contracting
214-797-4657  ·  [email protected]
Home / Services / Preston Hollow Kitchen Remodeling

Kitchen Remodeling in Preston Hollow

A large family kitchen with an island, or a dated kitchen in a Preston Hollow ranch house, designed by Jan Revels, ASID Allied, and built under her general contracting, with City of Dallas permits handled as part of the job.

ASID, American Society of Interior Designers, Allied Professional Interior Designer · Registered with the City of Dallas · Park Cities · Preston Hollow · Dallas
Kitchen with white raised-panel cabinets, granite counters, a dark wood island with a beverage refrigerator, a glass mosaic backsplash behind a stainless range and red glass pendants over the sink
Cedarbrush Kitchen — a large island planned around the aisles beside it

In short

For a large family kitchen with an island, or an update to a dated Preston Hollow ranch kitchen, look for a designer who can plan the room and carry that plan through construction. Chateau Concepts does both. Jan Revels, ASID Allied, draws the plan and elevations, makes the selections with you, and runs the build as general contractor. That continuity matters when opening an older Dallas kitchen or making a larger room work for family life.

The Work

Kitchens Jan designed and built

Real projects across Dallas and the Park Cities. Click any photo to view it full size.

White kitchen with a blue island, mosaic backsplash and pendant lighting
Azure KitchenFull kitchen design
Traditional kitchen with warm cabinetry, granite counters and a large island
Cedarbrush KitchenCabinetry & stone
Kitchen range wall with a mosaic glass backsplash and wall oven
Range Wall & BacksplashDetail
Breakfast nook with banquette seating beside a shaded window
Breakfast NookBanquette seating
Kitchen island detail with granite counter and painted cabinetry
Island & CountersDetail
Formal dining room with a dark table, buffet and framed art
Adjoining DiningOpen plan
Proof

The same kitchen, before and after

This is what a design plan does. Nothing here is staged or borrowed — these are Jan’s projects.

Before on the left · after on the right
Kitchen before and after: dated tile counters replaced with granite, glass mosaic backsplash and new appliances
Kitchen TransformationCounters, backsplash, appliances
Home bar before and after, rebuilt with cabinetry, stone counter and lighting
Bar & ServeryCabinetry & stone
Built-in cabinetry before and after in an adjoining family space
Adjoining Built-InsMillwork

See every transformation

How do we make a large family kitchen with an island work?

A large kitchen can still be awkward. Preston Hollow and North Dallas kitchens often have longer cabinet runs and more floor area, so proportion deserves as much attention as storage. An oversized island can turn a generous room into a daily obstacle.

We start with how your household uses the kitchen. Who cooks together? Where do children sit while dinner is prepared? Does the route to the backyard pass through the cooking area?

Those answers determine the island’s job. It may provide preparation space, seating, or a place for family members to gather while someone cooks. We draw those uses together, then check what happens when stools are occupied and the dishwasher is open.

Island and aisle numbers for a large kitchen

ElementPlanning dimensionWhy it matters
Work aisle for one cook42 inchesProvides room to work along the island
Work aisle for two cooks48 inchesAllows more room for shared cooking
Aisle where a dishwasher door opens48 inchesAccounts for the open door
Aisle behind seated stools44 inchesPreserves passage behind occupied seating
Walkway without work activity36 inches minimum; 42 inches comfortableDistinguishes a passage from a cooking aisle
Clear seating run24 inches per stoolGives each person usable seating space
Seating overhang12–15 inchesProvides room beneath the counter
Island depth36–40 inches for a work surface; 42–48 inches for work plus seating on one sideMatches depth to the island’s purpose
Island length and seating72 inches seats 3; 96 inches seats 4Connects seating expectations to available length
Very long islandOver 144 inches, consider two islandsAvoids repeated trips around a 12-foot obstacle

What this means for you: these dimensions help test whether an island fits the way your family lives. A larger island earns its space only when the surrounding aisles, seating, and routes through the house work together.

Our kitchen island design and sizing guide gives you a useful reference before consultation.

Screenshot of the Island with a cooktop and seating dimensions table from the Chateau Concepts kitchen island guide, with the row Width per stool, 24 inches of clear run, highlighted
From the kitchen island guide: the dimensions to check when an island carries a cooktop and seating. Look at the highlighted row: each stool needs 24 inches of clear run, counted on the seating side only, so four stools need 8 feet of island before anything else is on it. Screenshot: chateauconcepts.com/kitchen-island-design-and-sizing, November 2026.

The island also needs to belong to the room visually. We balance its length and depth against the perimeter cabinets, adjoining family room, and breakfast area. Our kitchen layouts compared guide can help you consider whether the room needs an island-centered plan or a different arrangement.

Should we keep the layout or open up a dated Preston Hollow ranch kitchen?

Older Preston Hollow kitchens were often built for a different household routine. Closed walls, small windows, a service entrance, and no island can leave the kitchen disconnected from the family room and backyard.

Opening the room is often the right direction. Before drawing that layout, however, we establish whether the wall is load-bearing and where the plumbing stack and gas line run. Both can change the cost meaningfully, and they are far cheaper to discover during planning than on demolition day.

Keep the layout or change the room?

ApproachWhen it deserves considerationMain construction or cost issueWhat we establish first
Refresh within the existing layoutThe sink, range, refrigerator, and circulation already workCabinetry, counters, tile, and lighting can update the room without relocating utilitiesWhether the existing arrangement supports your household
Open a wallSeparation from adjoining rooms is the main problemStructural work and utility routes may affect the scopeWhether the wall carries a load and what runs through it
Relocate the sink or add island plumbingA different layout would materially improve daily useSlab cutting may be requiredSlab conditions and plumbing routes
Relocate the rangeThe cooking position limits a useful new layoutGas relocation and ventilation need coordinationGas route and the proposed ventilation arrangement
Extend toward a patio or additionThe kitchen needs a stronger outdoor connection or more spaceMature trees may affect the planCity of Dallas Arborist input before fixing the design

What this means for you: the best value depends on what is actually wrong with the kitchen. If the layout works, a substantial finish and cabinetry refresh may serve you better than moving the working parts of the room.

Many Dallas houses sit on a slab. Moving sink or island plumbing can mean cutting concrete, and post-tension slabs require care around tensioning cables. Keeping the sink, range, and refrigerator in place avoids moving plumbing and gas—the largest single cost variable.

For wall changes, our guide to removing a load-bearing wall explains the planning issue to consider. We use the drawing stage to establish whether opening the room delivers enough benefit to justify the work.

The house beyond the kitchen matters, too. In a long, mostly single-story plan, material choices repeat across substantial distances. Running one floor through as much of the house as possible can give the renovation continuity.

Long systems runs also deserve attention; hot water takes time to reach the far end. We consider the kitchen’s relationship to the primary suite, children’s rooms, and outdoor areas rather than treating it as an isolated project. See the Preston Hollow renovation guide for the broader house context.

Which City of Dallas permits apply to a Preston Hollow kitchen?

Preston Hollow is inside the City of Dallas. Kitchen permits, inspections, and contractor registration go through Dallas, unlike work in the separate municipalities of Highland Park or University Park.

A kitchen remodel usually needs a permit because kitchens almost always involve plumbing, electrical work, or both. We handle the applications as part of the build. The required work and inspections need to be accounted for in the construction sequence.

Chateau Concepts, LLC is registered with the City of Dallas as a general contractor and carries general liability insurance. Certificates are available on request.

A proposed kitchen addition or new covered patio also raises a site question. Preston Hollow’s large lots and mature trees make indoor-outdoor living realistic, but a plan near a tree should go to the City of Dallas Arborist before it is fixed.

At consultation, we distinguish a kitchen refresh from work involving structure, utility relocation, or an addition. That gives the permit discussion a defined scope and helps you understand which design choices carry construction consequences.

In what order should we make the design decisions?

The decision order keeps later selections tied to an approved plan. Choosing a backsplash before a counter, or ordering cabinetry before appliance dimensions are settled, creates avoidable conflicts.

We follow this sequence:

  1. Layout. Establish working clearances, seating, storage, and routes through the room. Resolve the wall and utility questions that could change the design.
  2. Cabinetry. Develop the cabinet arrangement and choose stock, semi-custom, or fully custom cabinetry. Floor plans and elevations drawn to scale show what the cabinetmaker will build.
  3. Appliances and plumbing. Specify the appliances and plumbing selections. Appliance dimensions must be settled before cabinetry is ordered because they drive the openings.
  4. Counters. Select against the actual slab in daylight. The counter needs to work with the approved cabinetry and the room as a whole.
  5. Backsplash. Choose it afterward, standing next to the counter material. This lets you judge the combination directly.
  6. Lighting. Coordinate task, ambient, and accent lighting, separately switched and dimmable.
  7. Hardware. Finish the selection sequence with hardware that works with the cabinetry and completed material choices.

The cabinet plan can be developed before every appliance is final, but the order cannot be released on assumed appliance sizes. That distinction lets design move forward while protecting the fit of the finished kitchen.

We also ask whether storage belongs entirely in the main kitchen. A separate serving or support area may be worth exploring when cooking and entertaining compete for the same surfaces. Our butler’s pantry and scullery design guide helps frame that choice.

Bring us the kitchen as it is and the problems you want solved. Call 214-797-4657 or book a design consultation, and we can evaluate the layout before you commit to individual products.

How long will the remodel take, and when will the kitchen be unavailable?

The schedule includes design, ordering, construction, and dependencies between trades. Cabinets require approval before their lead time begins. Counter templating cannot start until the cabinets are installed.

Kitchen remodeling timeline

PhaseTypical durationWhat the timing means
Design and selections6–12 weeksTime to develop drawings and settle the selections
Cabinetry lead time6–16 weeks from approvalVaries with stock, semi-custom, or custom cabinetry
On-site construction6–12 weeksPlan to be without a working kitchen during this phase
Counter template to installation2–4 weeksCannot start until cabinets are in

What this means for you: these ranges describe different parts of the project, so they should not simply be added into a promised completion date. We build the schedule around approvals, the cabinetry selection, and the work that must happen in sequence.

Plan to be without a working kitchen during construction. Discuss your household’s meals and daily routine during planning, while there is still time to prepare for the disruption.

Carry a contingency of 10–15 percent, with a higher allowance for a house built before 1980. That reserve matters when concealed conditions become visible during demolition.

There is no honest single figure for a kitchen remodel in Dallas. Moving plumbing and gas can change the cost substantially, so the scope needs to be defined before a budget discussion becomes useful. A refresh that retains the working layout and a remodel that opens walls and relocates island plumbing are different projects.

What does Chateau Concepts include in the kitchen remodel?

Our kitchen remodeling in Dallas service connects design with general contracting. We plan the room, develop the drawings, make selections with you, and carry that work into construction.

The design scope covers layout and clearances, floor plans and elevations drawn to scale, cabinetry, counters and backsplash, appliances and ventilation, and lighting. Cabinetry may be stock, semi-custom, or fully custom. Custom built-ins and cabinetry can address storage needs as part of the room’s plan.

The construction scope covers demolition, structural work, rough-in, inspections, tile, cabinetry, counter templating and installation, trim, paint, and the finish trades. The scope follows the approved design, with trades scheduled and work checked against the drawings.

The portfolio offers different design directions to discuss. Cedarbrush Kitchen pairs warm traditional cabinetry and granite counters with a large island. Blue Sky Kitchen uses painted cream cabinets and a sink run open to the family room.

The kitchen before-and-after above shows tile counters replaced with granite, a glass mosaic backsplash, and new appliances. The bar and servery before-and-after is a reference for supporting spaces.

Why have one designer-builder run the project?

In an older house, the design continues to matter after demolition begins. When something unexpected appears behind a wall, someone has to decide how to respond without losing the room you approved.

At Chateau Concepts, that person is Jan. She draws the plan and elevations, makes selections with you, and runs the build herself as general contractor. The person making a construction decision understands why the room was designed that way.

Jan Revels, ASID Allied, has practiced interior design in Dallas since 1997 and founded Chateau Concepts, LLC in 2001. She holds a BFA in Interior Design from the University of North Texas. We work in Preston Hollow, North Dallas and the Park Cities.

That local work spans different house types. Mid-century ranch houses, later traditional houses, and recent rebuilds can share a Preston Hollow street. The right approach comes from the individual house, its structure, and your household’s needs.

Chateau Concepts is rated 4.9 stars from 19 Google reviews. Alongside those reviews, ask practical questions: Who draws the elevations? Who coordinates the selections? Who checks the installed work? Who decides when concealed conditions affect the plan?

Our guide to who should design your kitchen remodel helps you evaluate those responsibilities. For broader work connecting the kitchen to adjoining rooms, explore our approach to interior design in Preston Hollow.

We also offer design-only engagements and hourly remodeling consulting for homeowners using their own builder. Those services provide planning and selections when you already have a construction arrangement.

How It Runs

From first walk-through to the last drawer pull

Step 1

Consultation

Walk the kitchen, talk about how you actually cook and entertain, and get honest first impressions on the spot.

Step 2

Plan & elevations

Layout options, clearances checked, every wall drawn to scale. This is where changing your mind costs nothing.

Step 3

Selections

Cabinetry, stone, tile, appliances, fittings, lighting and hardware — chosen together so they work together.

Step 4

Build

Trades scheduled, permits pulled, work checked against the approved drawings, and one weekly update to you.

Why Homeowners Choose Jan

Four things that are true here and rare elsewhere

Design and build, one person

Jan designs the space and then runs the build. No hand-off, no two firms blaming each other, and nothing lost between the drawing and the crew.

Drawings before decisions

Floor plans and elevations first, so you see the room before it exists. On paper, changing your mind is free. After the plumbing is run, it is not.

Registered and insured

Chateau Concepts, LLC is registered as a general contractor with the City of Dallas, which requires registered contractors to carry general liability insurance. Certificates available on request.

Since 1997, and personally led

4.9★ from 19 Google reviews. The person you meet at the consultation is the person on site at installation.

Frequently asked questions

Who is the best kitchen designer for a large family kitchen in Preston Hollow?
Look for someone who can demonstrate a workable island plan, scaled drawings, coordinated selections, and clear responsibility during construction. Chateau Concepts provides design and build services, with Jan Revels, ASID Allied, planning the kitchen and running the build as general contractor.
Can you update an older Preston Hollow ranch kitchen without moving everything?
Yes. If the layout works, refreshing cabinetry, counters, tile, and lighting is frequently the better value. Keeping the sink, range, and refrigerator in place avoids relocating plumbing and gas.
Does a Preston Hollow kitchen remodel need a Dallas permit?
A kitchen remodel usually needs a permit because plumbing, electrical work, or both are typically involved. Preston Hollow is within the City of Dallas, and Chateau Concepts handles the applications.
How much space should we allow around an island?
Allow 42 inches for a one-cook work aisle and 48 inches for two cooks or where a dishwasher door opens. Allow 44 inches behind seated stools. A walkway without work activity needs 36 inches minimum, with 42 inches more comfortable.
How long is on-site kitchen construction?
The typical on-site construction duration is 6–12 weeks. Design, selections, and cabinetry lead time also affect the schedule. Plan to be without a working kitchen during construction.
Who handles unexpected conditions behind a wall?
Jan runs the build as general contractor and makes the decisions when unexpected conditions appear. Because she designed the room, she can evaluate those decisions against the approved plan.
Can we hire Chateau Concepts for design with our own builder?
Yes. We offer design-only engagements and hourly remodeling consulting, including planning and selections for homeowners working with their own builder.
Everything Else

The rest of what Jan does

Remodeling a Preston Hollow kitchen?

Start with a walk-through. Jan tells you whether the layout can stay, what the island needs around it, and what the plan should settle before anything is ordered.

Book a Design Consultation