Dallas & Park Cities Interior Design & General Contracting
214-797-4657  ·  [email protected]
Home / Services / North Dallas Kitchen Remodeling

Kitchen Remodeling in North Dallas

Cabinets, stone counters, tile and appliances under one contract: Jan Revels, ASID Allied, designs the kitchen and runs the build as general contractor, with City of Dallas permits handled as part of the job.

ASID, American Society of Interior Designers, Allied Professional Interior Designer · Registered with the City of Dallas · Park Cities · Preston Hollow · Dallas
White kitchen with a blue island, mosaic backsplash and pendant lighting
Azure Kitchen — cabinets, stone, tile and appliances planned as one

In short

Chateau Concepts is a North Dallas kitchen remodeling contractor that handles cabinets, stone counters, tile and appliances under one design-build contract. Jan Revels, ASID Allied, draws your kitchen to scale, makes selections with you and runs construction as your general contractor. The same person who planned the appliance openings and cabinet runs coordinates the trades on site and checks their work against the drawings you approved.

The Work

Kitchens Jan designed and built

Real projects across Dallas and the Park Cities. Click any photo to view it full size.

White kitchen with a blue island, mosaic backsplash and pendant lighting
Azure KitchenFull kitchen design
Traditional kitchen with warm cabinetry, granite counters and a large island
Cedarbrush KitchenCabinetry & stone
Kitchen range wall with a mosaic glass backsplash and wall oven
Range Wall & BacksplashDetail
Breakfast nook with banquette seating beside a shaded window
Breakfast NookBanquette seating
Kitchen island detail with granite counter and painted cabinetry
Island & CountersDetail
Formal dining room with a dark table, buffet and framed art
Adjoining DiningOpen plan
Proof

The same kitchen, before and after

This is what a design plan does. Nothing here is staged or borrowed — these are Jan’s projects.

Before on the left · after on the right
Kitchen before and after: dated tile counters replaced with granite, glass mosaic backsplash and new appliances
Kitchen TransformationCounters, backsplash, appliances
Home bar before and after, rebuilt with cabinetry, stone counter and lighting
Bar & ServeryCabinetry & stone
Built-in cabinetry before and after in an adjoining family space
Adjoining Built-InsMillwork

See every transformation

Key takeaways

Who handles what in a North Dallas kitchen remodel?

We design the kitchen and coordinate the cabinetmaker, stone fabricator, tile setter, plumber and electrician under one contract. Jan draws the floor plan and elevations to scale. The floor plan shows how the room fits together from above, while the elevations show each cabinet wall face-on. You use those drawings to approve the layout, and the cabinetmaker builds from them.

Who handles what in a North Dallas kitchen remodel

ScopeWho handles itWhen we decide it
Layout and clearancesJan draws the plan and checks work aisles, seating and door swings.First, before cabinetry or finishes.
Cabinets and custom built-insJan plans the storage and elevations. The cabinetmaker works from the approved drawings.After layout. We confirm appliance dimensions before the order goes in.
Stone countersWe select the slab with you. The fabricator templates and installs the stone.Select after appliances and plumbing. Template after cabinets are in.
Backsplash tileWe choose the tile with you. The tile setter installs it.After stone selection, with the tile held beside the actual slab.
Appliances and ventilationWe specify the appliances and hood and coordinate the openings and connections.Before cabinets are ordered.
Plumbing and electricalThe plumber and electrician handle rough-in and final connections. Jan coordinates both.Establish plumbing and gas routes before drawing a reconfiguration. Finalize lighting after backsplash selection.
Permits and inspectionsChateau Concepts handles applications and coordinates inspections with the City of Dallas.Determine what the scope requires before construction and schedule inspections as work progresses.

What this means for you: If you change the refrigerator or range, tell Jan before the cabinet order goes in. She can check how the new model affects the opening, adjacent doors and drawers, and the connections while those changes can still be made on paper.

On site, we schedule demolition, any structural work, plumbing and electrical rough-in, and inspections. We also coordinate cabinetry, countertop templating and installation, tile, trim, paint and finish trades. You can see the full scope on our service page for kitchen remodeling in Dallas.

Should I refresh my North Dallas kitchen or change the layout?

In many newer North Dallas homes, the kitchen already opens to a two-story family room. The layout works, but dated cabinets, counters or lighting can make the kitchen feel out of step with the space next to it. We look at the kitchen from the family room as well as from the work aisle. A long cabinet run needs to look proportionate from across the room and put everyday storage where you use it.

Older North Dallas kitchens often have smaller windows, a wall between the kitchen and family room, and limited room for an island. Opening the room can improve the connection to the rest of the house. Before drawing that option, Jan establishes whether the wall is load-bearing and where the plumbing stack and gas line run. Those findings shape where an opening, sink or range can go.

Refresh or reconfigure?

What you have nowWhat we’d considerWhy it matters
A sound layout with dated finishesRefresh cabinetry, counters, backsplash and lighting.Keeping the sink, range and refrigerator in place can avoid moving plumbing and gas.
A kitchen open to a two-story family roomKeep the footprint and revise cabinet proportions, finishes and lighting.The cabinet walls and island read as part of the adjoining room.
A closed kitchen with poor access to the family roomEvaluate an opening before choosing an island or moving work zones.Wall structure and utility routes determine how much can change.
A proposed island sink in a slab-on-grade houseCompare the island sink with keeping the sink in its current location.Moving plumbing can mean cutting concrete. Post-tension slabs require care around the cables.

What this means for you: Think about what you would still want to change after the finishes were updated. If two people would still collide at the dishwasher or the wall would still cut the cook off from the family room, we should test a layout change before you commit to cabinets.

If your house is still being built, the time to check outlet locations, pendant positions and blocking is before closing. Compare those locations with the plan, and discuss a plumbing rough-in if you want a future bar. For work beyond the kitchen, see how we approach the rest of the house as an interior designer in North Dallas. If you’re building, see new-build interiors in North Dallas.

How much room do I need for a kitchen island?

Measure the aisle by what happens in it. A work aisle needs room for the cook to move between counters. A walkway carries people through the kitchen. Where those routes overlap, check the plan with the dishwasher open and someone seated at the island.

Island clearances and seating

What you’re sizingDimension
Work aisle42 inches for one cook or 48 inches for two
Aisle where a dishwasher door opens48 inches
Clearance behind seated stools44 inches
Walkway36 inches minimum or 42 inches for a comfortable passage
Seating space24 inches of counter run per stool and a 12–15-inch overhang
Island depth36–40 inches for a single work surface or 42–48 inches for work plus seating
Island length for seating72 inches seats three or 96 inches seats four
Very long islandOver 144 inches, consider two islands

What this means for you: If you want four seats, check the 96-inch run, the stool clearance and the path past the dishwasher on the same plan. The counter may fit while the seat nearest the dishwasher still interferes with cleanup.

In larger North Dallas kitchens, especially where the island faces the family room, we look at how its length relates to the cabinet wall behind it. We also check where people enter, where they sit and whether the route from the refrigerator to the prep counter crosses their path. Our guides cover kitchen island design and sizing and the long cabinet runs we consider in kitchen remodeling in Preston Hollow.

Does my North Dallas kitchen remodel need a City of Dallas permit?

Yes, in most cases. Kitchen remodels usually involve plumbing, electrical work or both. Replacing cabinets in the same layout usually does not require a permit when the work is limited to the cabinets. If you also plan to move outlets, relocate a sink or open a wall, we review those changes as part of the scope.

North Dallas is within the City of Dallas, so permits, inspections and contractor registration go through the city. We handle the permit applications and coordinate inspections with the work on site. For example, we account for inspection timing when we schedule rough-in and the work that will cover it.

Chateau Concepts, LLC is registered with the City of Dallas as a general contractor and carries general liability insurance. Certificates are available on request. When we meet at your house, we can discuss how a proposed wall opening, appliance move or lighting change affects the permit scope.

What should I decide first, and when do I pick the finishes?

We start at your house. Tell us how you cook and entertain, where groceries land, and what gets in the way when someone else is in the kitchen. Jan gives you her first impressions, including what the room can accommodate and which ideas the house rules out. She then draws the plan and elevations to scale so you can revise them before materials are ordered.

  1. Layout. Set the work zones, entrances and aisle clearances. Check the route from the refrigerator to the prep counter, and see how an open dishwasher affects the path through the room.
  2. Cabinetry. Decide what each run needs to hold, then choose stock, semi-custom or fully custom cabinetry. Review door and drawer placement on the elevations. See kitchen cabinet styles and doors.
  3. Appliances and plumbing. Specify the refrigerator, cooking appliances, ventilation, dishwasher and sink before the cabinet order goes in. Appliance dimensions drive the openings, and the approved layout tells the trades where connections belong. See kitchen appliance planning.
  4. Counters. Choose stone against the actual slab in daylight. Look at how the pattern runs across the slab and where you’d see it on the island and perimeter. Our guide covers eight materials. See kitchen countertops compared.
  5. Backsplash. Hold the tile beside the selected slab. A tile that looks quiet on its own can compete with the stone once the two are side by side. Use the elevations to review where the tile starts and stops. See kitchen backsplash and tile.
  6. Lighting. Plan task light for food prep, ambient light for the room and accent light for features such as glass-front cabinets. We put the layers on separate switches and dimmers so you can light the work surface while keeping the room softer after dinner.
  7. Hardware. Choose pulls and knobs with the door style and finish in front of you. Check how a pull feels on a drawer you’ll use daily and how it looks repeated across a long cabinet run.

The Cedarbrush Kitchen shows how these decisions come together. White raised-panel cabinets and granite counters frame a dark wood island with a beverage refrigerator. The island was planned around the appliance, and the glass mosaic backsplash and red glass pendants had to work with finishes already chosen for the room.

If you’re deciding whether to keep the footprint or open the kitchen to the family room, call 214-797-4657 or book a design consultation. We can walk the room with you and discuss what each option would change about the way you use it.

How long will I be without a working kitchen?

Plan to be without a working kitchen during on-site construction. Design and selections happen before the build, and cabinet production has its own lead time. The construction schedule also depends on when the installed cabinets are ready for the stone fabricator to measure.

Typical kitchen remodel timeline

PhaseTypical durationWhat determines when it starts
Design and selections6–12 weeksWe start with the house consultation, then draw the plan and elevations and work through material choices.
Cabinetry lead time6–16 weeks from approvalLead time depends on whether the cabinets are stock, semi-custom or custom.
Custom millwork fabrication10–16 weeksThis is the typical fabrication period when the design calls for custom millwork.
On-site construction6–12 weeksThe sequence accounts for demolition, any structural work, rough-in, inspections, installations and finishes.
Counter template to installation2–4 weeksThe fabricator can template only after the cabinets are in.

What this means for you: Read these as phase ranges. The counter interval begins with the template, so installed cabinets can still be weeks away from finished counters. Before demolition, ask Jan to walk through which dates affect your household and when you’ll need a temporary place for meals and cleanup.

During the build, Jan schedules trades, orders and tracks materials, walks the site and compares the work with the approved drawings. You get one weekly update. Tile, trim, paint and final connections each have to fit around the installations and inspections that come before them.

Why hire one designer-builder for the whole kitchen?

An appliance opening shows why it helps to have the person who drew the room running the build. The cabinetmaker works from an elevation, the appliance needs a specific opening, and the plumber or electrician needs the connection in the right location. Jan can check all three against the same approved plan before a discrepancy affects the installation.

The same coordination matters when demolition exposes something unexpected behind a wall. Jan can look at what the trades found and assess what a change would do to the layout, clearances and cabinet elevations. You can discuss the change with the person who drew the room and is responsible for building it.

Jan Revels, ASID Allied, has practiced interior design in Dallas since 1997 and founded Chateau Concepts, LLC in 2001. She holds a BFA in Interior Design from the University of North Texas. Chateau Concepts has a 4.9-star rating from 19 Google reviews.

How It Runs

From first walk-through to the last drawer pull

Step 1

Consultation

Walk the kitchen, talk about how you actually cook and entertain, and get honest first impressions on the spot.

Step 2

Plan & elevations

Layout options, clearances checked, every wall drawn to scale. This is where changing your mind costs nothing.

Step 3

Selections

Cabinetry, stone, tile, appliances, fittings, lighting and hardware — chosen together so they work together.

Step 4

Build

Trades scheduled, permits pulled, work checked against the approved drawings, and one weekly update to you.

PhaseTypical duration
Design and selections6–12 weeks
Cabinetry lead time from approval6–16 weeks, depending on stock, semi-custom or custom
On-site construction6–12 weeks
Counter template to installation2–4 weeks, and it cannot start until cabinets are in
Why Homeowners Choose Jan

Four things that are true here and rare elsewhere

Design and build, one person

Jan designs the space and then runs the build. No hand-off, no two firms blaming each other, and nothing lost between the drawing and the crew.

Drawings before decisions

Floor plans and elevations first, so you see the room before it exists. On paper, changing your mind is free. After the plumbing is run, it is not.

Registered and insured

Chateau Concepts, LLC is registered as a general contractor with the City of Dallas, which requires registered contractors to carry general liability insurance. Certificates available on request.

Since 1997, and personally led

4.9★ from 19 Google reviews. The person you meet at the consultation is the person on site at installation.

Frequently asked questions

Can we keep our sink and range where they are?
Yes. If the layout works, keeping the sink, range and refrigerator in place can avoid moving plumbing and gas. We can focus the work on the cabinets, counters, tile and lighting.
Can we keep the arch if we add a wet bar?
It depends on the opening and the layout. In our portfolio, we kept an existing arch and converted the plain wall beneath it into a wet bar with a granite counter, glass-front cabinets and a mosaic tile surround. See the portfolio.
Can we work with you if we already have a builder?
Yes. We offer design-only engagements and hourly remodeling consulting. Jan can develop the plan and help with selections for your own builder to carry out.
How much contingency should we set aside?
Plan for a contingency of 10–15 percent for a kitchen remodel. Set aside a higher contingency if the house was built before 1980.
Can we see proof of insurance?
Yes. Chateau Concepts, LLC carries general liability insurance, and certificates are available on request. The company is registered with the City of Dallas as a general contractor.
How do we start a North Dallas kitchen remodel?
Call 214-797-4657 or book a design consultation. We’ll meet at your house, talk through how you use the kitchen and give you our first impressions of what the space can accommodate.
Everything Else

The rest of what Jan does

Remodeling a North Dallas kitchen?

Start with a walk-through. Jan tells you whether the layout can stay, what a refresh would change, and what has to be settled before cabinets are ordered.

Book a Design Consultation