Dallas & Park Cities Interior Design & General Contracting
214-797-4657  ·  [email protected]
Home / Services / Preston Hollow Bathroom Remodeling

Primary Bathroom Remodeling in Preston Hollow

A primary bath in a mid-century ranch, a later traditional house or a recent rebuild, designed by Jan Revels, ASID, and built under her general contracting, with City of Dallas permits handled as part of the job.

ASID, American Society of Interior Designers, Allied Professional Interior Designer · Registered with the City of Dallas · Park Cities · Preston Hollow · Dallas
Modern master bathroom with a floating stone vanity and a gold-framed mirror, built by Chateau Concepts in Dallas
A large bath needs proportion as much as storage

In short

For a primary bathroom remodel contractor in Preston Hollow, Dallas, hire a team that can connect the design to the construction decisions your house requires. At Chateau Concepts, Jan Revels, ASID, designs the room and runs the build herself as general contractor. We are registered with the City of Dallas and carry general liability insurance, with certificates available on request. That gives you a direct line from the layout and selections to the person scheduling trades, checking construction, and resolving what turns up behind the walls.

Preston Hollow bathrooms need that connection. A primary suite in a mid-century ranch presents different questions from a bath in a later traditional house or a substantial recent rebuild. Foundation conditions, plumbing locations, room proportions, and the distance to other parts of the house all affect the work.

The Work

Bathrooms Jan designed and built

Real projects across Dallas and the Park Cities.

Wood vanity against a full wall of diamond mosaic tile
Arabesque Tile AccentsVanity and stone
Double vanity in teal with marble counters and fan-tile backsplash
Jack & Jill BathroomStorage and stone
Powder room with an antique chest vanity and candle sconces
Antique Chest Powder RoomPowder room
Bathroom with a corner tub, long vanity run and window seat
Tub and Vanity RunFull bathroom
Coastal bathroom styling detail with starfish trim on linens
Coastal Bath DetailStyling
Children bedroom with bunk beds and bright bedding
Kids Bath and BedroomFamily wing
Proof

Bathrooms, before and after

Waterproofing is invisible once the tile is on. These are the results of doing it properly.

Before on the left · after on the right
Bathroom before and after: tub and sliding doors replaced with a tiled walk-in shower
Tub to Walk-InFull rebuild
Master bathroom before and after: rebuilt tub deck, surround and finishes
Master BathTub deck and surround
Powder room before and after: new vanity, counter, mirror and sconces
Powder RoomVanity and mirror

See every transformation

We begin with the house you have, how you use it, and whether the plumbing needs to move. Then we develop a room that can be built, maintained, and used comfortably over time.

Who to hire: a designer who also runs the construction

Choosing a primary bathroom contractor means choosing who will make decisions when drawings meet existing conditions. A beautiful plan is useful only if someone carries its dimensions, proportions, and details through the build.

Jan has practiced interior design in Dallas since 1997 and founded Chateau Concepts, LLC in 2001. She holds a BFA in Interior Design from the University of North Texas and is an ASID Allied Professional Interior Designer.

At Chateau Concepts, Jan designs the space and then manages construction herself. She schedules trades, orders and tracks materials, walks the site, and holds the work to the drawings. When something unexpected appears behind a wall, the person deciding what happens next is the person who designed the room.

That continuity matters when a plumbing discovery affects a shower, a material change affects an elevation, or a construction detail threatens the proportions you approved. We can evaluate the practical issue alongside its effect on the finished space.

Our work includes Preston Hollow, North Dallas, and the Park Cities. Chateau Concepts is rated 4.9 stars from 15 Google reviews and has a portfolio on Houzz. Named testimonials on our site include Mary Pat Higgins, Sharon Devereux, Paula Grier, and Kathleen Ray. Those are useful starting points for evaluating our work alongside the actual scope and process proposed for your home.

For an overview of our design and construction service, visit bathroom remodeling in Dallas. To discuss your Preston Hollow primary bath, call 214-797-4657 or book a design consultation.

Mid-century ranch: establish what can stay before moving plumbing

In a Preston Hollow mid-century ranch, the first design question is whether the existing plumbing locations can support a better room. Moving fixtures may improve circulation or make room for a generous shower, but plumbing relocation is the largest single cost variable.

Before drawing a new arrangement, we establish whether the house has a pier-and-beam foundation with crawl-space access or a slab. These conditions change how plumbing work can be approached. Slab work may require cutting concrete; a post-tension slab requires care around its tensioning cables. The house’s age alone does not answer that question.

We then examine what the current arrangement gets wrong. Does the tub occupy space that would serve you better as a shower or closet? Does the vanity placement support comfortable use? Can we improve the room while retaining useful plumbing locations?

The comparison needs to happen on a scaled plan. Keeping plumbing in place is worthwhile when it supports a strong layout. Keeping it at the expense of daily function can preserve the very problem you intended to fix.

The ranch plan also deserves attention beyond the bathroom door. In a long single-story house, the primary suite may be far from the kitchen and children’s rooms. Hot water can take time to reach the far end, and heating and cooling need proper zoning. Those conditions belong in the remodeling conversation before finishes are selected.

A ground-floor primary suite is already an advantage for long-term living. We can build on that advantage through aging-in-place bathroom design, including a usable layout, considered lighting, and blocking for future grab bars while the walls are open.

Later traditional house: give a large bathroom purpose

In a later traditional Preston Hollow house, the challenge may be a generous room whose size does not translate into usefulness. More floor area creates more choices, but it can also leave a bathroom feeling empty or poorly proportioned.

We start by assessing the relationship among the vanity, shower, tub, storage, and adjoining closet. The question is whether each part earns its space and works with the rest of the room.

A substantial tub deck, for example, should be evaluated against how the household actually bathes. If it remains, its proportions and surrounding details need to belong to the room. If it goes, the recovered area should have a clear purpose: a more generous walk-in shower, improved circulation, or a larger closet.

Ceiling height matters as well. Preston Hollow rooms are often larger, with ceilings frequently higher than those in older Park Cities houses. A vanity or mirror arrangement that looks balanced in a smaller room may feel undersized here. We use elevations to study those relationships before construction.

Material choices also multiply with area. Extending a finish across a large room changes the scope of the selection. We decide where a material contributes most and where a simpler treatment supports the overall design.

Primary suite design helps connect these decisions. A bathroom can work well internally and still leave an awkward relationship with the closet or bedroom. We consider the suite together so that gaining space in one area produces a meaningful improvement elsewhere.

Our approach to interior design in Preston Hollow starts with those proportions and relationships, then moves into finishes.

Recent rebuild: confirm the conditions behind the finished room

A recent rebuild may have a large primary bathroom and substantial finishes. That does not establish whether its layout, waterproofing, ventilation, or systems serve your household well.

We begin with the reason for remodeling. You may want a different relationship between shower and closet, better lighting at the vanity, or a room whose proportions feel more comfortable. Defining that problem keeps the project focused.

Next, we separate visible finishes from conditions that need to be established. A recently built house still requires a clear understanding of its foundation before plumbing moves. A large shower still needs a correctly sloped pan and continuous waterproofing. A finished ceiling does not tell you whether ventilation is sized to the room and ducted outside.

The extent of the remodel should follow the intended result. Retaining a fixture location may preserve useful work. Moving it may be justified when the improvement to daily use is substantial. We make that comparison before treating the layout as settled.

In a large recent rebuild, restraint can be an important design decision. Storage, mirrors, lighting, and materials need enough presence to suit the room, without filling every surface simply because space is available.

The broader Preston Hollow renovation guide provides context for a neighborhood where ranch houses, later traditional homes, and substantial recent rebuilds can occupy the same streets. Each bathroom scope needs to respond to its own house.

Layout and scope: make the expensive decisions on paper

Before selecting tile or fixtures, we resolve the decisions that shape construction. Plumbing relocation comes first because it is the largest single cost variable. After that, we examine how the room supports daily use and how each choice affects the adjoining suite.

The following comparisons help establish a useful scope without assigning unpublished prices.

DecisionWhat retaining the current arrangement offersWhat a change may accomplishWhat we establish before deciding
Keep or move plumbingPreserves fixture locations and limits relocation workCreates a better relationship among shower, vanity, tub, and closetFoundation type, access, and the practical value of the new layout
Keep or remove the primary tubMaintains bathing in the primary suiteMakes room for a generous walk-in shower or larger closetWhether at least one bathtub remains elsewhere in the house
Retain or rebuild a tub deckPreserves the existing footprintChanges its proportions and relationship to surrounding finishesWhether the tub is used and whether the deck serves the room
Use a material broadly or selectivelyA broad application can establish continuitySelective use can give a feature greater emphasisTotal surface area and the role of each finish
Remodel the bath alone or consider the suiteKeeps attention within the bathroomCoordinates bathroom, closet, and bedroom relationshipsWhere the actual daily-use problem begins and ends

We advise keeping at least one bathtub somewhere in the house. Within the primary bath, a generous walk-in shower and larger closet are a trade most households prefer. Your household’s use should determine whether that trade belongs in your plan.

Our guide to shower or tub explores that choice. For the arrangement of the room itself, see primary bathroom layouts that work.

The goal is to approve a layout for clear reasons. A fixture should move because the improvement warrants the work. A tub should stay because it serves you. A large room should have deliberate proportions rather than unused area between unrelated elements.

What the build must get right: waterproofing, ventilation, and systems

Layout, waterproofing, and ventilation decide whether a bathroom serves for decades. Finish selections deserve care, but these underlying decisions deserve equal attention.

For waterproofing, the assembly needs cement or foam board, a continuous membrane, a correctly sloped shower pan, and flexible movement joints at every change of plane. These components must work together.

Ask to see the membrane before tile covers it. Photograph every open wall before it is closed. Those are concrete opportunities to understand and document the work while it remains visible. Attractive tile cannot show you what was installed beneath it.

Ventilation must be sized to the room, ducted outside, and controlled by a timer or humidity sensor. In a large Preston Hollow bathroom, we treat ventilation as part of the room’s design and construction scope. Its purpose is to serve the actual room.

Lighting needs a similarly deliberate arrangement. We plan light from both sides of the mirror, ambient light for the room, and a low-level night light. Each serves a different use: seeing your face, moving comfortably through the room, and using the bath at night.

While walls are open, we include blocking for grab bars. That supports future flexibility and belongs in the construction discussion even when grab bars are not part of the immediate design.

We also address the bathroom’s place within the house. Long single-story plans can mean long hot-water runs and a need for proper heating and cooling zoning. A newly finished bathroom should not leave those existing concerns unexamined.

Preston Hollow sits within the City of Dallas, so permitting runs through Dallas rather than a separate town, unlike the Park Cities. During our build process, permits are pulled, trades are scheduled, and work is checked against the drawings. Our guide to permits and trades in Dallas explains that part of the work.

How we run the remodel, from consultation through glass

Our process begins with a consultation. We walk the rooms and give honest first impressions. That means discussing the current bathroom, the adjoining suite, the house type, and the decisions likely to affect the scope.

We then draw the plan and elevations to scale. This is where changing your mind costs nothing. We work through fixture locations, proportions, storage, and the relationship between materials before construction begins.

Selections are chosen together. We consider them as parts of the whole room: how a finish looks across its intended area, how it relates to the vanity and shower, and whether its scale suits the space. Ordering and tracking materials then become part of carrying the design into construction.

During the build, Jan schedules trades, walks the site, and checks the work against the drawings. We provide one weekly update. When existing conditions require a decision, Jan can assess that decision in the context of the design she developed with you.

Typical durations are:

The glass interval belongs in the planning conversation because it follows finished tile and measurement. These are typical durations; the sequence for your bathroom needs to reflect its scope and selections.

To see the kinds of changes our work includes, review the portfolio bathrooms with real before-and-after photographs: a tub replaced with a tiled walk-in shower and bench, a rebuilt master bath tub deck and surround, and the Agate Master Bath.

We also offer design-only engagements and hourly remodeling consulting. If you have your own builder, we can develop the plan and selections for that arrangement. If you want Jan to carry the design through construction, our bathroom remodeling service combines design and general contracting.

How It Runs

The order the work happens in

Step 1

Consultation

Walk the room, establish whether the plumbing can move, and be honest about what that costs.

Step 2

Plan and elevations

Fixture placement, clearances and every wall drawn — including where the sconces land.

Step 3

Selections

Tile, stone, fittings, vanity, glass and lighting, chosen against each other rather than in isolation.

Step 4

Build

Waterproofing inspected before tile, curing respected, and the finish trades sequenced properly.

Why Homeowners Choose Jan

Four things that are true here and rare elsewhere

Design and build, one person

Jan designs the space and then runs the build. No hand-off, no two firms blaming each other, and nothing lost between the drawing and the crew.

Drawings before decisions

Floor plans and elevations first, so you see the room before it exists. On paper, changing your mind is free. After the plumbing is run, it is not.

Registered and insured

Chateau Concepts, LLC is registered as a general contractor with the City of Dallas, which requires registered contractors to carry general liability insurance. Certificates available on request.

Since 1997, and personally led

4.9★ from 15 Google reviews. The person you meet at the consultation is the person on site at installation.

Frequently asked questions

Who handles primary bathroom remodeling at Chateau Concepts?
Jan Revels, ASID, designs the bathroom and runs construction herself as general contractor. Her work includes scheduling trades, ordering and tracking materials, walking the site, and checking construction against the drawings. Chateau Concepts is registered with the City of Dallas and carries general liability insurance.
Does a Preston Hollow bathroom remodel go through Dallas permitting?
Yes. Preston Hollow sits within the City of Dallas, so permitting runs through the city rather than a separate town. Chateau Concepts’ build process includes pulling permits and scheduling trades.
What is the biggest cost variable in a primary bathroom remodel?
Whether the plumbing moves is the largest single cost variable. The work depends on whether the house has a pier-and-beam foundation with crawl-space access or a slab. Slab work may require cutting concrete, and post-tension slabs require care around tensioning cables.
How do Preston Hollow house types affect bathroom planning?
Mid-century ranches, later traditional houses, and recent rebuilds require attention to their actual layouts and construction conditions. Preston Hollow often has large or predominantly single-story homes with long plans, larger rooms, and higher ceilings. Plumbing runs, room proportions, and the relationship to the primary suite affect planning.
How long does a full primary bathroom remodel take?
Design and selections typically take 4–8 weeks. On-site construction for a full primary bathroom typically takes 4–8 weeks. Frameless shower glass typically takes 2–3 weeks after tile is finished and measured.
Should we remove the bathtub from our primary bathroom?
We advise keeping at least one bathtub somewhere in the house. In the primary bathroom, a generous walk-in shower and larger closet are a trade most households prefer. The decision should reflect household use and whether another bathtub remains.
Can Chateau Concepts design the bathroom if we have our own builder?
Yes. We offer design-only engagements and hourly remodeling consulting, including a plan and selections for your own builder. We also provide bathroom design and construction managed by Jan.
Everything Else

The rest of what Jan does

Remodeling a Preston Hollow primary bath?

Start with a walk-through. Jan tells you whether the plumbing can stay, and what the room needs to feel right at its size.

Book a Design Consultation