Dallas & Park Cities Interior Design & General Contracting
214-797-4657  ·  [email protected]
Home / Insights / Commercial

Reception and lobby design

A reception is judged in about ten seconds and used for twenty minutes. Designing for the first without designing for the second produces a space that photographs well and nobody wants to sit in.

Commercial · 7 min read · Written & reviewed by Jan Revels, ASID · designing in Dallas since 1997

Short answer

Three things do most of the work: a clear sight line to whoever greets people, seating that an older visitor can get out of unaided, and lighting that makes faces look well rather than tired.

Accessibility is a legal requirement, not a preference. Commercial projects in Texas fall under both the federal Americans with Disabilities Act and the Texas Accessibility Standards, which govern counter heights, clear floor space, routes and door hardware.

Acoustics decide whether the space feels calm. A hard-surfaced lobby amplifies every conversation, and visitors overhear what they should not.

What is a reception actually for?

Four jobs, and a design that serves only the first is the common failure:

  1. Signal what kind of organization this is. Quality of material and detail says more than any signage.
  2. Direct people. A visitor should know where to go without asking.
  3. Hold them comfortably. Twenty minutes in a chair, with somewhere to set a coffee and a phone, and enough power to charge one.
  4. Let staff work. Reception is somebody’s office. It needs storage, power, screens they can see and visitors cannot, and a surface that is not permanently on display.

The commercial context and how it differs from residential work is set out in commercial interior design in Dallas.

The first ten seconds

Designed and built by one team

Commercial work runs on codes, landlord approvals and a schedule that has to fit around an operating business — and on the same fundamentals as any interior: plan it, draw it, specify it, build it.

Jan Revels designs and general-contracts commercial interiors across Dallas.

Counters, accessibility and heights

Accessibility requirements apply here, and reception counters are one of the most commonly non-compliant elements in an otherwise well-built fit-out. Requirements are set by the applicable federal and state standards and by your jurisdiction’s adopted codes — confirm the specifics for your project rather than relying on general figures.

ElementDesign consideration
Accessible counter sectionA lowered portion with knee clearance, and a clear floor space in front of it
Transaction surfaceDeep enough to sign a document and set down a bag
Staff sideScreens angled away from the visitor side; power and data within reach
StorageEnough that the counter surface can be kept clear
RoutesAccessible route from entry to reception to seating to restrooms
Door hardwareOperable without tight grasping, pinching or twisting
SignageTactile and visual requirements apply at permanent rooms

Depending on scope and value, a project may require registration and independent accessibility review in Texas. Establish that early — it affects the drawing package and the programme, not just the details.

What seating should a waiting area have?

The most common and most avoidable failure in a waiting area. Low, deep, soft seating is comfortable for a healthy thirty-year-old and genuinely difficult for an older visitor or anyone with a hip or knee problem.

Acoustics and privacy

Materials, lighting and wear

Key takeaways

  • A reception is judged in ten seconds and used for twenty minutes. Design for both.
  • A clear sight line to the greeting point is the first requirement.
  • Accessibility is a legal requirement; counters are the most commonly non-compliant element.
  • Seats at 18 to 19 inches, firm, with arms on at least half of them.
  • Power at seating level — visitors will charge phones.
  • Acoustic treatment is what makes a hard-surfaced lobby feel calm.
  • Specify contract-grade materials; residential specification fails fast under commercial traffic.

Frequently asked questions

What makes a reception area work?
A clear sight line from the entrance to whoever greets people, seating an older visitor can get out of unaided, somewhere to set a coffee and charge a phone, and lighting with good color rendering so faces look well. Behind that, a reception is also somebody's workplace, so it needs storage, power and screens angled away from visitors — a counter permanently covered in paperwork undoes everything else.
Are there accessibility rules for a reception counter?
Yes. Commercial projects in Texas fall under both the federal Americans with Disabilities Act and the Texas Accessibility Standards, alongside the building codes your municipality has adopted. These govern counter heights and knee clearance, clear floor space, accessible routes from entry to reception to restrooms, door hardware and signage. Depending on scope and value, a project may also require registration and independent accessibility review — establish that early.
What seating should a waiting area have?
Seats at 18 to 19 inches high, firm rather than soft, 18 to 20 inches deep, with arms on at least half of them — arms are how people push themselves up, and low deep sofas exclude older visitors from sitting at all. Mix upright chairs with softer seating, give every seat a surface within reach, add power at seating level, and leave space for a wheelchair within the group rather than beside it.
Why does my office lobby feel noisy?
Because stone or tile floors, glass walls and a hard ceiling reflect sound rather than absorbing it, so every conversation carries across the space. The most effective single change is acoustic ceiling treatment, which can be detailed to look deliberate rather than institutional. A rug in the seating zone, upholstered furniture and fabric panels do the rest, and sound masking helps where confidential conversations happen nearby.
Can I use residential furniture in a commercial reception?
It rarely lasts. Commercial spaces see a multiple of residential traffic, and residential upholstery, frames and floor finishes fail within about two years under it. Contract-grade specification exists precisely for this — higher rub counts on fabrics, sturdier frames, floor finishes rated for commercial wear. It is also worth checking flammability and other requirements that apply to commercial interiors and not to homes.
Jan Revels, ASID Allied Professional Interior Designer
ASID Allied Professional Interior Designer · Chateau Concepts, Dallas

Jan has practiced interior design in Dallas since 1997 and founded Chateau Concepts in 2001. She holds a BFA in Interior Design from the University of North Texas. She designs and general-contracts residential and commercial projects across the Park Cities, Preston Hollow and North Dallas. Read her full profile →

Written and reviewed by Jan Revels before publication

Reception dating your business?

It is a small area with a disproportionate effect. Jan designs and builds commercial interiors in Dallas.

Book a Design Consultation