Short answer
Custom upholstery and made-to-measure drapery are the long poles. They are built to order after the fabric arrives at the workroom, so any fabric delay becomes a furniture delay. Order these first, before anything else, regardless of what is decided last.
Nothing should be delivered until everything can be. Items arrive at a receiving warehouse, get inspected, and are held until a single installation day. Piecemeal delivery into a live house is how pieces get damaged and rooms never get photographed.
Build the schedule backwards from the date you want to sit down in the room, not forwards from when the design is approved.
On this page
Why lead times run the schedule
On a construction project, the schedule is set by trades. On a furnishing project, it is set by whatever takes longest to make — and that is almost never the item people worry about.
The reason is that custom upholstery is a two-stage wait. The fabric is ordered from one supplier and shipped to the workroom; only when it arrives does the frame get built and covered. If the fabric is back-ordered, nothing at the workroom can start, and the clock does not begin until the roll is on the bench. A four-week fabric delay is a four-week furniture delay, added on top of the build time.
This is why an experienced designer orders in a counter-intuitive sequence: the long-lead custom items go first, often before the rug and almost always before the accessories, even though those are conceptually “later” decisions. Waiting to order the sofa until the scheme is completely resolved is the most common reason an install date slips by a season.
How long do things actually take?
Times move with supply conditions and vary by maker, so treat these as planning categories rather than promises. What is stable is the relative order.
| Item | Relative wait | What drives it |
|---|---|---|
| Custom upholstery | Longest | Fabric delivery to the workroom, then build time |
| Made-to-measure drapery | Long | Fabric, then workroom, then hardware install |
| Custom cabinetry and millwork | Long | Shop drawings, approval, fabrication, finishing |
| Imported case goods | Long and variable | Ocean freight and customs, which are outside anyone’s control |
| Stone slabs | Medium | Selection, templating after cabinets are set, fabrication |
| Domestic case goods in stock | Short | Availability at the time of order, not at the time of selection |
| Lighting and accessories | Shortest, usually | Stock levels; a discontinued finish resets the clock |
Two rules follow. Availability is checked at the moment of ordering, not selection. A piece confirmed in stock during the presentation can be gone three weeks later. And a discontinued fabric restarts a decision you thought was closed — which is why designers hold a second choice on the long-lead items from the beginning.
If you want to be sitting in the room by a particular week, the order sequence is not a detail — it is the whole plan. Long-lead items first, everything else timed to land with them.
Jan Revels orders, tracks and receives the pieces herself, so one late fabric does not quietly become a late house.
What happens between order and delivery
- Specification. Model, dimensions, fabric, finish, leg style, cushion fill, nailhead, contrast welt. Every one of these is a field on the order and an error in any of them is a remake.
- Confirmation. The vendor acknowledges the order and states an estimated ship window. This is an estimate, not a commitment.
- Fabric to workroom for anything upholstered or made to measure.
- Production. The piece is built. Changes after this point are usually impossible or chargeable.
- Freight. Shipped to a receiving warehouse, not to your house.
- Receiving and inspection. Unpacked, checked against the order, photographed, and held.
- Installation day. Everything delivered and placed at once, drapery hung, art hung, lamps wired, styling done.
Steps five to seven are the ones homeowners rarely anticipate, and they are where a designer’s procurement service earns its place. The alternative is a garage full of boxes and a claim you have to file yourself.
Why receiving and inspection matter
Freight damage is not rare. A sofa can travel a thousand miles and arrive with a crushed corner or a scuff along one arm. Three things follow from that:
- Damage found at the warehouse is a claim. Damage found in your living room after you signed for it is an argument.
- A replacement restarts the lead time. Which is why inspection happens on arrival, not on installation day — discovering a problem the morning everything is due to be placed is the worst possible moment.
- Storage is not free, and it is not optional. Holding pieces until the room is ready protects them from a construction site and from a house full of dust.
How do you protect the install date?
- Order long-lead items first, even if smaller decisions are still open.
- Approve fabric memos promptly. A memo sitting on a table for two weeks is two weeks added to the end of the project.
- Hold a second choice on every custom upholstery piece and every drapery fabric.
- Do not change specification after production starts. If it must change, decide in hours, not days.
- Coordinate with construction. Furniture should not arrive before final paint and floor protection comes up. See what a remodel timeline really looks like.
- Measure the route, not just the room. Stair turns, elevator dimensions, door widths and the front gate. A sofa that fits the plan and not the staircase is a returned sofa.
- Give the real deadline early. A designer can protect a date they know about and cannot protect one mentioned in month four.
When something arrives wrong
The realistic outcomes, in order of frequency:
- Minor freight damage — repaired on site by a furniture medic, usually invisibly.
- Wrong finish or fabric — a remake, and the lead time restarts. Check the confirmation against the specification when it arrives, not when the piece does.
- Discontinued mid-order — the second choice is used, which is why one was held.
- Does not fit — avoidable, and avoided by measuring the route in advance.
None of these is a catastrophe if there is a plan and someone whose job it is to chase. All of them are a catastrophe if the answer to “who is handling this” turns out to be you, in the week before a family gathering.
Key takeaways
- Custom upholstery and drapery set the schedule. Order them first, always.
- Fabric delay equals furniture delay — production does not start until the roll arrives.
- Availability is confirmed at ordering, never at selection.
- Items go to receiving, get inspected and are held for one installation day.
- Hold a second-choice fabric on every long-lead item from the start.
- Measure the route into the room, not just the room.
- Tell the designer the real deadline at the first meeting, not in month four.
Frequently asked questions
How long does custom furniture take to arrive?
Why does furniture go to a warehouse instead of my house?
Can I order some pieces myself and have the designer do the rest?
What is a fabric memo and why does it matter?
Should everything be delivered on one day?
Work with Chateau Concepts
Jan Revels handles both sides of a project in Dallas and the Park Cities — the design and the build.